Wind Turbine Payback in Montrose County, CO

Wind turbine payback in Montrose County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Montrose County, CO averages 3.93 m/s (8.8 mph). A 10 kW turbine there would make about 6,231 kWh a year, worth $1,047 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 96 years, and the turbine is built to last about 20.

What to do in Montrose County

A home turbine is not worth buying for savings in Montrose County unless your spot is far windier than the county average, 7.4 m/s at the hub against 3.93 m/s here. Per kW, solar panels would make about 1,483 kWh a year here against the turbine's 623, so get a solar quote first.

What would have to change

Against the rest of CO

Montrose County is the 2,112th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Montrose County

April is the strongest month here, at 4.71 m/s and about 874 kWh. August is the weakest, 3.33 m/s and 313 kWh, so the best month makes 2.8 times the worst. November to March brings in 40% of the year's output in Montrose County.

MonthWind at 30 mOutputWorth
January3.57 m/s393 kWh$66
February4.15 m/s564 kWh$95
March4.34 m/s715 kWh$120
April4.71 m/s874 kWh$147
May4.28 m/s686 kWh$115
June4.41 m/s725 kWh$122
July3.42 m/s340 kWh$57
August3.33 m/s313 kWh$53
September3.71 m/s426 kWh$72
October3.83 m/s488 kWh$82
November3.84 m/s475 kWh$80
December3.71 m/s441 kWh$74

What a taller tower would buy

Measured at 10 m the wind in Montrose County averages 2.94 m/s; at 50 m it is 4.5 m/s. That gives a shear exponent of 0.264, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,461 to 9,339 kWh a year, 109% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.53 m/s4,461 kWhover 100 years
30 m3.93 m/s6,242 kWh95 years
40 m4.24 m/s7,856 kWh76 years
50 m4.5 m/s9,339 kWh64 years

Counties around Montrose County

2 of the 6 closest counties are windier at turbine height; the windiest, Mesa County, averages 4.25 m/s.

Sun versus wind in Montrose County

Montrose County gets 5.08 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,483 kWh a year; one kW of the turbine above makes 623. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.