Wind Turbine Payback in Northwest Arctic Borough, AK
Wind turbine payback in Northwest Arctic Borough
No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Northwest Arctic Borough, AK averages 5.52 m/s (12.3 mph). A 10 kW turbine there would make about 16,181 kWh a year, worth $4,421 at AK's 27.32¢/kWh. Against an installed cost of about $100,000, that is a payback of 23 years, and the turbine is built to last about 20.
What to do in Northwest Arctic Borough
A home turbine is not worth buying for savings in Northwest Arctic Borough unless your spot is far windier than the county average, 5.8 m/s at the hub against 5.52 m/s here. Per kW, solar panels would make about 715 kWh a year here against the turbine's 1,618, so get a solar quote first.
What would have to change
- Power would have to cost 31¢/kWh, 1.1 times what AK pays now.
- Or the average wind at the hub would have to be 5.8 m/s instead of 5.52. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of AK
Northwest Arctic Borough is the 1,207th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AK is Aleutians West Census Area at 9.35 m/s, payback 9 years.
Month by month in Northwest Arctic Borough
January is the strongest month here, at 7.25 m/s and about 2,446 kWh. June is the weakest, 3.79 m/s and 459 kWh, so the best month makes 5.3 times the worst. November to March brings in 64% of the year's output in Northwest Arctic Borough.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 7.25 m/s | 2,446 kWh | $668 |
| February | 7.00 m/s | 2,077 kWh | $567 |
| March | 6.19 m/s | 1,791 kWh | $489 |
| April | 5.38 m/s | 1,246 kWh | $340 |
| May | 4.35 m/s | 720 kWh | $197 |
| June | 3.79 m/s | 459 kWh | $125 |
| July | 3.90 m/s | 518 kWh | $142 |
| August | 4.24 m/s | 668 kWh | $182 |
| September | 4.80 m/s | 922 kWh | $252 |
| October | 5.73 m/s | 1,503 kWh | $411 |
| November | 6.66 m/s | 2,022 kWh | $552 |
| December | 7.00 m/s | 2,300 kWh | $628 |
What a taller tower would buy
Measured at 10 m the wind in Northwest Arctic Borough averages 4.39 m/s; at 50 m it is 6.14 m/s. That gives a shear exponent of 0.208, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,041 to 20,742 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 5.07 m/s | 13,041 kWh | 28 years |
| 30 m | 5.52 m/s | 16,189 kWh | 23 years |
| 40 m | 5.86 m/s | 18,680 kWh | 20 years |
| 50 m | 6.14 m/s | 20,742 kWh | 18 years |
Counties around Northwest Arctic Borough
2 of the 6 closest counties are windier at turbine height; the windiest, Kusilvak Census Area, averages 6.25 m/s.
- Nome Census Area, AK: 5.74 m/s, 17,785 kWh, payback 21 years (193 mi)
- North Slope Borough, AK: 4.73 m/s, 10,762 kWh, payback 34 years (238 mi)
- Yukon-Koyukuk Census Area, AK: 5.2 m/s, 13,907 kWh, payback 26 years (261 mi)
- Kusilvak Census Area, AK: 6.25 m/s, 21,558 kWh, payback 17 years (339 mi)
- Denali Borough, AK: 4.06 m/s, 6,883 kWh, payback 53 years (368 mi)
- Fairbanks North Star Borough, AK: 3.23 m/s, 3,333 kWh, payback over 100 years (414 mi)
Sun versus wind in Northwest Arctic Borough
Northwest Arctic Borough gets 2.45 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 715 kWh a year; one kW of the turbine above makes 1,618. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.