TurbinePayback

Wind Turbine Payback in Nuckolls County, NE

Wind turbine payback in Nuckolls County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Nuckolls County, NE averages 6.4 m/s (14.3 mph). A 10 kW turbine there would make about 22,669 kWh a year, worth $2,929 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Nuckolls County

A home turbine is not worth buying for savings in Nuckolls County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.4 m/s here. Per kW, solar panels would make about 1,299 kWh a year here against the turbine's 2,267, so get a solar quote first.

What would have to change

Against the rest of NE

Nuckolls County is the 322nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Nuckolls County

April is the strongest month here, at 7.30 m/s and about 2,396 kWh. August is the weakest, 5.38 m/s and 1,289 kWh, so the best month makes 1.9 times the worst. November to March brings in 43% of the year's output in Nuckolls County.

MonthWind at 30 mOutputWorth
January6.35 m/s1,896 kWh$245
February6.46 m/s1,773 kWh$229
March6.89 m/s2,229 kWh$288
April7.30 m/s2,396 kWh$310
May6.59 m/s2,041 kWh$264
June6.33 m/s1,819 kWh$235
July5.50 m/s1,360 kWh$176
August5.38 m/s1,289 kWh$167
September6.42 m/s1,878 kWh$243
October6.65 m/s2,080 kWh$269
November6.63 m/s2,002 kWh$259
December6.29 m/s1,857 kWh$240

What a taller tower would buy

Measured at 10 m the wind in Nuckolls County averages 5.01 m/s; at 50 m it is 7.17 m/s. That gives a shear exponent of 0.223, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,557 to 28,250 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.84 m/s18,557 kWh42 years
30 m6.4 m/s22,654 kWh34 years
40 m6.82 m/s25,761 kWh30 years
50 m7.17 m/s28,250 kWh27 years

Counties around Nuckolls County

2 of the 6 closest counties are windier at turbine height; the windiest, Adams County, averages 6.56 m/s.

Sun versus wind in Nuckolls County

Nuckolls County gets 4.45 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,299 kWh a year; one kW of the turbine above makes 2,267. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.