Wind turbine payback in Webster County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Webster County, NE averages 6.38 m/s (14.3 mph). A 10 kW turbine there would make about 22,521 kWh a year, worth $2,910 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 34 years, and the turbine is built to last about 20.

What to do in Webster County

A home turbine is not worth buying for savings in Webster County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.38 m/s here. Per kW, solar panels would make about 1,299 kWh a year here against the turbine's 2,252, so get a solar quote first.

What would have to change

Against the rest of NE

Webster County is the 359th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Webster County

April is the strongest month here, at 7.25 m/s and about 2,370 kWh. August is the weakest, 5.42 m/s and 1,314 kWh, so the best month makes 1.8 times the worst. November to March brings in 43% of the year's output in Webster County.

MonthWind at 30 mOutputWorth
January6.29 m/s1,855 kWh$240
February6.42 m/s1,752 kWh$226
March6.84 m/s2,200 kWh$284
April7.25 m/s2,370 kWh$306
May6.57 m/s2,029 kWh$262
June6.32 m/s1,812 kWh$234
July5.55 m/s1,391 kWh$180
August5.42 m/s1,314 kWh$170
September6.45 m/s1,893 kWh$245
October6.63 m/s2,068 kWh$267
November6.55 m/s1,953 kWh$252
December6.27 m/s1,844 kWh$238

What a taller tower would buy

Measured at 10 m the wind in Webster County averages 5 m/s; at 50 m it is 7.14 m/s. That gives a shear exponent of 0.221, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,456 to 28,038 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.83 m/s18,456 kWh42 years
30 m6.38 m/s22,505 kWh34 years
40 m6.8 m/s25,576 kWh30 years
50 m7.14 m/s28,038 kWh28 years

Counties around Webster County

4 of the 6 closest counties are windier at turbine height; the windiest, Adams County, averages 6.56 m/s.

Sun versus wind in Webster County

Webster County gets 4.45 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,299 kWh a year; one kW of the turbine above makes 2,252. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.