Wind Turbine Payback in Nye County, NV

Wind turbine payback in Nye County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Nye County, NV averages 4.71 m/s (10.5 mph). A 10 kW turbine there would make about 10,635 kWh a year, worth $1,421 at NV's 13.36¢/kWh. Against an installed cost of about $100,000, that is a payback of 70 years, and the turbine is built to last about 20.

What to do in Nye County

A home turbine is not worth buying for savings in Nye County unless your spot is far windier than the county average, 8.6 m/s at the hub against 4.71 m/s here. Per kW, solar panels would make about 1,626 kWh a year here against the turbine's 1,064, so get a solar quote first.

What would have to change

Against the rest of NV

Nye County is the 1,607th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. It is the windiest county in NV.

Month by month in Nye County

April is the strongest month here, at 5.50 m/s and about 1,319 kWh. November is the weakest, 4.37 m/s and 705 kWh, so the best month makes 1.9 times the worst. November to March brings in 40% of the year's output in Nye County.

MonthWind at 30 mOutputWorth
January4.36 m/s724 kWh$97
February4.85 m/s885 kWh$118
March5.26 m/s1,215 kWh$162
April5.50 m/s1,319 kWh$176
May5.04 m/s1,087 kWh$145
June5.08 m/s1,077 kWh$144
July4.45 m/s769 kWh$103
August4.43 m/s759 kWh$101
September4.39 m/s713 kWh$95
October4.38 m/s733 kWh$98
November4.37 m/s705 kWh$94
December4.44 m/s764 kWh$102

What a taller tower would buy

Measured at 10 m the wind in Nye County averages 3.8 m/s; at 50 m it is 5.21 m/s. That gives a shear exponent of 0.196, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,480 to 13,976 kWh a year, 65% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.35 m/s8,480 kWh88 years
30 m4.71 m/s10,658 kWh70 years
40 m4.99 m/s12,447 kWh60 years
50 m5.21 m/s13,976 kWh54 years

Counties around Nye County

None of the 6 closest counties is windier than Nye County.

Sun versus wind in Nye County

Nye County gets 5.57 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,626 kWh a year; one kW of the turbine above makes 1,064. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.