TurbinePayback

Wind Turbine Payback in Mono County, CA

Wind turbine payback in Mono County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mono County, CA averages 4.05 m/s (9.1 mph). A 10 kW turbine there would make about 6,831 kWh a year, worth $2,226 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 45 years, and the turbine is built to last about 20.

What to do in Mono County

A home turbine is not worth buying for savings in Mono County unless your spot is far windier than the county average, 5.4 m/s at the hub against 4.05 m/s here. Per kW, solar panels would make about 1,574 kWh a year here against the turbine's 683, so get a solar quote first.

What would have to change

Against the rest of CA

Mono County is the 2,027th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Mono County

March is the strongest month here, at 4.71 m/s and about 903 kWh. July is the weakest, 3.23 m/s and 283 kWh, so the best month makes 3.2 times the worst. November to March brings in 53% of the year's output in Mono County.

MonthWind at 30 mOutputWorth
January4.22 m/s659 kWh$215
February4.56 m/s746 kWh$243
March4.71 m/s903 kWh$294
April4.73 m/s883 kWh$288
May4.02 m/s569 kWh$185
June3.89 m/s495 kWh$161
July3.23 m/s283 kWh$92
August3.26 m/s291 kWh$95
September3.58 m/s384 kWh$125
October3.59 m/s400 kWh$130
November4.22 m/s638 kWh$208
December4.61 m/s850 kWh$277

What a taller tower would buy

Measured at 10 m the wind in Mono County averages 3.34 m/s; at 50 m it is 4.43 m/s. That gives a shear exponent of 0.175, typical of very open, smooth ground where height adds little. Going from 20 m to 50 m takes output from 5,494 to 8,924 kWh a year, 62% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.77 m/s5,494 kWh56 years
30 m4.05 m/s6,837 kWh45 years
40 m4.26 m/s7,955 kWh39 years
50 m4.43 m/s8,924 kWh34 years

Counties around Mono County

1 of the 6 closest counties is windier at turbine height; the windiest, Esmeralda County, averages 4.22 m/s.

Sun versus wind in Mono County

Mono County gets 5.39 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,574 kWh a year; one kW of the turbine above makes 683. Kilowatt for kilowatt, panels make 2.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.