TurbinePayback

Wind Turbine Payback in Pearl River County, MS

Wind turbine payback in Pearl River County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Pearl River County, MS averages 2.93 m/s (6.6 mph). A 10 kW turbine there would make about 2,398 kWh a year, worth $361 at MS's 15.06¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Pearl River County

A home turbine is not worth buying for savings in Pearl River County unless your spot is far windier than the county average, 7.9 m/s at the hub against 2.93 m/s here. Per kW, solar panels would make about 1,384 kWh a year here against the turbine's 240, so get a solar quote first.

What would have to change

Against the rest of MS

Pearl River County is the 3,098th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MS is DeSoto County at 5.13 m/s, payback 50 years.

Month by month in Pearl River County

March is the strongest month here, at 3.33 m/s and about 313 kWh. July is the weakest, 2.28 m/s and 79 kWh, so the best month makes 4.0 times the worst. November to March brings in 55% of the year's output in Pearl River County.

MonthWind at 30 mOutputWorth
January3.21 m/s279 kWh$42
February3.30 m/s274 kWh$41
March3.33 m/s313 kWh$47
April3.30 m/s294 kWh$44
May2.90 m/s196 kWh$30
June2.48 m/s107 kWh$16
July2.28 m/s79 kWh$12
August2.35 m/s91 kWh$14
September2.70 m/s147 kWh$22
October2.97 m/s215 kWh$32
November3.17 m/s257 kWh$39
December3.18 m/s270 kWh$41

What a taller tower would buy

Measured at 10 m the wind in Pearl River County averages 1.69 m/s; at 50 m it is 3.78 m/s. That gives a shear exponent of 0.500, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,136 to 5,523 kWh a year, 386% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.39 m/s1,136 kWhover 100 years
30 m2.93 m/s2,393 kWhover 100 years
40 m3.38 m/s3,871 kWhover 100 years
50 m3.78 m/s5,523 kWhover 100 years

Counties around Pearl River County

2 of the 6 closest counties are windier at turbine height; the windiest, Hancock County, averages 3.35 m/s.

Sun versus wind in Pearl River County

Pearl River County gets 4.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,384 kWh a year; one kW of the turbine above makes 240. Kilowatt for kilowatt, panels make 5.8 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.