TurbinePayback

Wind Turbine Payback in Pecos County, TX

Wind turbine payback in Pecos County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Pecos County, TX averages 6.32 m/s (14.1 mph). A 10 kW turbine there would make about 22,077 kWh a year, worth $3,539 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Pecos County

A home turbine is not worth buying for savings in Pecos County unless your spot is far windier than the county average, 7.6 m/s at the hub against 6.32 m/s here. Per kW, solar panels would make about 1,621 kWh a year here against the turbine's 2,208, so get a solar quote first.

What would have to change

Against the rest of TX

Pecos County is the 452nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Pecos County

April is the strongest month here, at 6.97 m/s and about 2,203 kWh. September is the weakest, 5.79 m/s and 1,491 kWh, so the best month makes 1.5 times the worst. November to March brings in 41% of the year's output in Pecos County.

MonthWind at 30 mOutputWorth
January6.13 m/s1,755 kWh$281
February6.48 m/s1,785 kWh$286
March6.61 m/s2,055 kWh$329
April6.97 m/s2,203 kWh$353
May6.69 m/s2,105 kWh$337
June6.75 m/s2,075 kWh$333
July6.28 m/s1,852 kWh$297
August5.90 m/s1,608 kWh$258
September5.79 m/s1,491 kWh$239
October6.09 m/s1,733 kWh$278
November6.04 m/s1,644 kWh$264
December6.10 m/s1,738 kWh$279

What a taller tower would buy

Measured at 10 m the wind in Pecos County averages 5.04 m/s; at 50 m it is 7.02 m/s. That gives a shear exponent of 0.206, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,318 to 27,186 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.81 m/s18,318 kWh34 years
30 m6.32 m/s22,068 kWh28 years
40 m6.7 m/s24,908 kWh25 years
50 m7.02 m/s27,186 kWh23 years

Counties around Pecos County

1 of the 6 closest counties is windier at turbine height; the windiest, Upton County, averages 6.37 m/s.

Sun versus wind in Pecos County

Pecos County gets 5.55 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,621 kWh a year; one kW of the turbine above makes 2,208. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.