No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Ward County, TX averages 5.53 m/s (12.4 mph). A 10 kW turbine there would make about 16,254 kWh a year, worth $2,605 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 38 years, and the turbine is built to last about 20.

What to do in Ward County

A home turbine is not worth buying for savings in Ward County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.53 m/s here. Per kW, solar panels would make about 1,641 kWh a year here against the turbine's 1,625, so get a solar quote first.

What would have to change

Against the rest of TX

Ward County is the 1,195th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Ward County

April is the strongest month here, at 6.29 m/s and about 1,794 kWh. September is the weakest, 5.10 m/s and 1,084 kWh, so the best month makes 1.7 times the worst. November to March brings in 41% of the year's output in Ward County.

MonthWind at 30 mOutputWorth
January5.39 m/s1,296 kWh$208
February5.76 m/s1,375 kWh$220
March5.92 m/s1,623 kWh$260
April6.29 m/s1,794 kWh$288
May5.88 m/s1,600 kWh$256
June5.84 m/s1,522 kWh$244
July5.49 m/s1,356 kWh$217
August5.08 m/s1,110 kWh$178
September5.10 m/s1,084 kWh$174
October5.23 m/s1,199 kWh$192
November5.21 m/s1,150 kWh$184
December5.31 m/s1,247 kWh$200

What a taller tower would buy

Measured at 10 m the wind in Ward County averages 4.35 m/s; at 50 m it is 6.19 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 12,973 to 21,113 kWh a year, 63% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.06 m/s12,973 kWh48 years
30 m5.53 m/s16,289 kWh38 years
40 m5.89 m/s18,925 kWh33 years
50 m6.19 m/s21,113 kWh30 years

Counties around Ward County

4 of the 6 closest counties are windier at turbine height; the windiest, Pecos County, averages 6.32 m/s.

Sun versus wind in Ward County

Ward County gets 5.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,641 kWh a year; one kW of the turbine above makes 1,625. Kilowatt for kilowatt, panels make 1.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.