Wind turbine payback in Red Lake County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Red Lake County, MN averages 6.34 m/s (14.2 mph). A 10 kW turbine there would make about 22,225 kWh a year, worth $3,654 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 27 years, and the turbine is built to last about 20.

What to do in Red Lake County

A home turbine is not worth buying for savings in Red Lake County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.34 m/s here. Per kW, solar panels would make about 1,121 kWh a year here against the turbine's 2,223, so get a solar quote first.

What would have to change

Against the rest of MN

Red Lake County is the 420th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Red Lake County

October is the strongest month here, at 6.73 m/s and about 2,132 kWh. July is the weakest, 5.60 m/s and 1,423 kWh, so the best month makes 1.5 times the worst. November to March brings in 42% of the year's output in Red Lake County.

MonthWind at 30 mOutputWorth
January6.39 m/s1,919 kWh$315
February6.37 m/s1,723 kWh$283
March6.58 m/s2,037 kWh$335
April6.81 m/s2,112 kWh$347
May6.61 m/s2,060 kWh$339
June6.08 m/s1,671 kWh$275
July5.60 m/s1,423 kWh$234
August5.68 m/s1,473 kWh$242
September6.45 m/s1,895 kWh$312
October6.73 m/s2,132 kWh$351
November6.54 m/s1,950 kWh$321
December6.19 m/s1,795 kWh$295

What a taller tower would buy

Measured at 10 m the wind in Red Lake County averages 5.04 m/s; at 50 m it is 7.05 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,383 to 27,400 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.82 m/s18,383 kWh33 years
30 m6.34 m/s22,196 kWh27 years
40 m6.73 m/s25,084 kWh24 years
50 m7.05 m/s27,400 kWh22 years

Counties around Red Lake County

3 of the 6 closest counties are windier at turbine height; the windiest, Clearwater County, averages 6.56 m/s.

Sun versus wind in Red Lake County

Red Lake County gets 3.84 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,121 kWh a year; one kW of the turbine above makes 2,223. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.