No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Marshall County, MN averages 6.31 m/s (14.1 mph). A 10 kW turbine there would make about 22,003 kWh a year, worth $3,617 at MN's 16.44¢/kWh. Against an installed cost of about $100,000, that is a payback of 28 years, and the turbine is built to last about 20.

What to do in Marshall County

A home turbine is not worth buying for savings in Marshall County unless your spot is far windier than the county average, 7.5 m/s at the hub against 6.31 m/s here. Per kW, solar panels would make about 1,101 kWh a year here against the turbine's 2,200, so get a solar quote first.

What would have to change

Against the rest of MN

Marshall County is the 460th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MN is Lincoln County at 6.68 m/s, payback 25 years.

Month by month in Marshall County

October is the strongest month here, at 6.67 m/s and about 2,097 kWh. July is the weakest, 5.62 m/s and 1,438 kWh, so the best month makes 1.5 times the worst. November to March brings in 43% of the year's output in Marshall County.

MonthWind at 30 mOutputWorth
January6.40 m/s1,928 kWh$317
February6.36 m/s1,716 kWh$282
March6.56 m/s2,024 kWh$333
April6.74 m/s2,067 kWh$340
May6.58 m/s2,035 kWh$335
June6.05 m/s1,647 kWh$271
July5.62 m/s1,438 kWh$236
August5.71 m/s1,494 kWh$246
September6.41 m/s1,872 kWh$308
October6.67 m/s2,097 kWh$345
November6.51 m/s1,931 kWh$317
December6.16 m/s1,776 kWh$292

What a taller tower would buy

Measured at 10 m the wind in Marshall County averages 5.01 m/s; at 50 m it is 7.03 m/s. That gives a shear exponent of 0.210, typical of ordinary open country. Going from 20 m to 50 m takes output from 18,222 to 27,257 kWh a year, 50% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.8 m/s18,222 kWh33 years
30 m6.31 m/s22,039 kWh28 years
40 m6.71 m/s24,934 kWh24 years
50 m7.03 m/s27,257 kWh22 years

Counties around Marshall County

4 of the 6 closest counties are windier at turbine height; the windiest, Grand Forks County, averages 6.4 m/s.

Sun versus wind in Marshall County

Marshall County gets 3.77 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,101 kWh a year; one kW of the turbine above makes 2,200. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.