TurbinePayback

Wind Turbine Payback in San Diego County, CA

Wind turbine payback in San Diego County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in San Diego County, CA averages 3.87 m/s (8.7 mph). A 10 kW turbine there would make about 5,942 kWh a year, worth $1,936 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 52 years, and the turbine is built to last about 20.

What to do in San Diego County

A home turbine is not worth buying for savings in San Diego County unless your spot is far windier than the county average, 5.4 m/s at the hub against 3.87 m/s here. Per kW, solar panels would make about 1,699 kWh a year here against the turbine's 594, so get a solar quote first.

What would have to change

Against the rest of CA

San Diego County is the 2,157th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in San Diego County

December is the strongest month here, at 4.42 m/s and about 751 kWh. August is the weakest, 3.16 m/s and 264 kWh, so the best month makes 2.8 times the worst. November to March brings in 52% of the year's output in San Diego County.

MonthWind at 30 mOutputWorth
January4.33 m/s710 kWh$231
February4.30 m/s629 kWh$205
March4.09 m/s598 kWh$195
April4.33 m/s687 kWh$224
May4.08 m/s594 kWh$194
June3.71 m/s428 kWh$139
July3.27 m/s296 kWh$96
August3.16 m/s264 kWh$86
September3.21 m/s268 kWh$87
October3.54 m/s383 kWh$125
November3.98 m/s532 kWh$173
December4.42 m/s751 kWh$245

What a taller tower would buy

Measured at 10 m the wind in San Diego County averages 3.29 m/s; at 50 m it is 4.17 m/s. That gives a shear exponent of 0.147, typical of very open, smooth ground where height adds little. Going from 20 m to 50 m takes output from 4,924 to 7,461 kWh a year, 52% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.64 m/s4,924 kWh62 years
30 m3.87 m/s5,934 kWh52 years
40 m4.04 m/s6,757 kWh45 years
50 m4.17 m/s7,461 kWh41 years

Counties around San Diego County

3 of the 6 closest counties are windier at turbine height; the windiest, Imperial County, averages 4.5 m/s.

Sun versus wind in San Diego County

San Diego County gets 5.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,699 kWh a year; one kW of the turbine above makes 594. Kilowatt for kilowatt, panels make 2.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.