Wind Turbine Payback in Sargent County, ND

Wind turbine payback in Sargent County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sargent County, ND averages 6.44 m/s (14.4 mph). A 10 kW turbine there would make about 22,964 kWh a year, worth $2,861 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Sargent County

A home turbine is not worth buying for savings in Sargent County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.44 m/s here. Per kW, solar panels would make about 1,142 kWh a year here against the turbine's 2,296, so get a solar quote first.

What would have to change

Against the rest of ND

Sargent County is the 280th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Sargent County

October is the strongest month here, at 6.95 m/s and about 2,267 kWh. July is the weakest, 5.57 m/s and 1,405 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Sargent County.

MonthWind at 30 mOutputWorth
January6.51 m/s1,995 kWh$249
February6.42 m/s1,751 kWh$218
March6.58 m/s2,040 kWh$254
April6.92 m/s2,173 kWh$271
May6.78 m/s2,162 kWh$269
June6.14 m/s1,707 kWh$213
July5.57 m/s1,405 kWh$175
August5.67 m/s1,466 kWh$183
September6.62 m/s1,996 kWh$249
October6.95 m/s2,267 kWh$282
November6.70 m/s2,044 kWh$255
December6.45 m/s1,956 kWh$244

What a taller tower would buy

Measured at 10 m the wind in Sargent County averages 5.1 m/s; at 50 m it is 7.18 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,015 to 28,320 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.91 m/s19,015 kWh42 years
30 m6.44 m/s22,963 kWh35 years
40 m6.85 m/s25,940 kWh31 years
50 m7.18 m/s28,320 kWh28 years

Counties around Sargent County

4 of the 6 closest counties are windier at turbine height; the windiest, Marshall County, averages 6.68 m/s.

Sun versus wind in Sargent County

Sargent County gets 3.91 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,142 kWh a year; one kW of the turbine above makes 2,296. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.