Wind Turbine Payback in Ashland County, WI

Wind turbine payback in Ashland County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Ashland County, WI averages 4.4 m/s (9.8 mph). A 10 kW turbine there would make about 8,748 kWh a year, worth $1,667 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 60 years, and the turbine is built to last about 20.

What to do in Ashland County

A home turbine is not worth buying for savings in Ashland County unless your spot is far windier than the county average, 6.9 m/s at the hub against 4.4 m/s here. Per kW, solar panels would make about 1,042 kWh a year here against the turbine's 875, so get a solar quote first.

What would have to change

Against the rest of WI

Ashland County is the 1,818th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Ashland County

January is the strongest month here, at 5.22 m/s and about 1,193 kWh. June is the weakest, 3.55 m/s and 373 kWh, so the best month makes 3.2 times the worst. November to March brings in 57% of the year's output in Ashland County.

MonthWind at 30 mOutputWorth
January5.22 m/s1,193 kWh$227
February5.31 m/s1,123 kWh$214
March4.81 m/s955 kWh$182
April4.55 m/s793 kWh$151
May3.91 m/s520 kWh$99
June3.55 m/s373 kWh$71
July3.57 m/s391 kWh$74
August3.71 m/s443 kWh$84
September4.19 m/s621 kWh$118
October4.46 m/s772 kWh$147
November4.72 m/s879 kWh$167
December4.88 m/s997 kWh$190

What a taller tower would buy

Measured at 10 m the wind in Ashland County averages 3.08 m/s; at 50 m it is 5.19 m/s. That gives a shear exponent of 0.324, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 5,880 to 13,837 kWh a year, 135% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.86 m/s5,880 kWh89 years
30 m4.4 m/s8,739 kWh60 years
40 m4.83 m/s11,394 kWh46 years
50 m5.19 m/s13,837 kWh38 years

Counties around Ashland County

6 of the 6 closest counties are windier at turbine height; the windiest, Price County, averages 5.7 m/s.

Sun versus wind in Ashland County

Ashland County gets 3.57 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,042 kWh a year; one kW of the turbine above makes 875. Kilowatt for kilowatt, panels make 1.2 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.