Wind turbine payback in Talladega County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Talladega County, AL averages 3.21 m/s (7.2 mph). A 10 kW turbine there would make about 3,265 kWh a year, worth $539 at AL's 16.51¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Talladega County

A home turbine is not worth buying for savings in Talladega County unless your spot is far windier than the county average, 7.5 m/s at the hub against 3.21 m/s here. Per kW, solar panels would make about 1,308 kWh a year here against the turbine's 327, so get a solar quote first.

What would have to change

Against the rest of AL

Talladega County is the 2,874th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AL is Mobile County at 4.72 m/s, payback 57 years.

Month by month in Talladega County

March is the strongest month here, at 3.73 m/s and about 449 kWh. July is the weakest, 2.41 m/s and 100 kWh, so the best month makes 4.5 times the worst. November to March brings in 57% of the year's output in Talladega County.

MonthWind at 30 mOutputWorth
January3.62 m/s408 kWh$67
February3.70 m/s395 kWh$65
March3.73 m/s449 kWh$74
April3.68 m/s418 kWh$69
May3.11 m/s249 kWh$41
June2.64 m/s137 kWh$23
July2.41 m/s100 kWh$17
August2.48 m/s111 kWh$18
September2.93 m/s198 kWh$33
October3.26 m/s291 kWh$48
November3.49 m/s352 kWh$58
December3.51 m/s369 kWh$61

What a taller tower would buy

Measured at 10 m the wind in Talladega County averages 1.97 m/s; at 50 m it is 4.03 m/s. That gives a shear exponent of 0.445, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,751 to 6,729 kWh a year, 284% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.68 m/s1,751 kWhover 100 years
30 m3.21 m/s3,267 kWhover 100 years
40 m3.65 m/s4,944 kWhover 100 years
50 m4.03 m/s6,729 kWh90 years

Counties around Talladega County

2 of the 6 closest counties are windier at turbine height; the windiest, Coosa County, averages 3.22 m/s.

Sun versus wind in Talladega County

Talladega County gets 4.48 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,308 kWh a year; one kW of the turbine above makes 327. Kilowatt for kilowatt, panels make 4.0 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.