Wind turbine payback in Thurston County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Thurston County, WA averages 2.81 m/s (6.3 mph). A 10 kW turbine there would make about 2,073 kWh a year, worth $299 at WA's 14.42¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Thurston County

A home turbine is not worth buying for savings in Thurston County unless your spot is far windier than the county average, 8.1 m/s at the hub against 2.81 m/s here. Per kW, solar panels would make about 1,013 kWh a year here against the turbine's 207, so get a solar quote first.

What would have to change

Against the rest of WA

Thurston County is the 3,122nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WA is Columbia County at 5.18 m/s, payback 50 years.

Month by month in Thurston County

January is the strongest month here, at 3.25 m/s and about 288 kWh. July is the weakest, 2.27 m/s and 79 kWh, so the best month makes 3.6 times the worst. November to March brings in 60% of the year's output in Thurston County.

MonthWind at 30 mOutputWorth
January3.25 m/s288 kWh$42
February3.04 m/s208 kWh$30
March3.13 m/s254 kWh$37
April2.83 m/s175 kWh$25
May2.52 m/s119 kWh$17
June2.52 m/s115 kWh$17
July2.27 m/s79 kWh$11
August2.29 m/s81 kWh$12
September2.52 m/s115 kWh$17
October2.92 m/s201 kWh$29
November3.28 m/s288 kWh$42
December3.23 m/s284 kWh$41

What a taller tower would buy

Measured at 10 m the wind in Thurston County averages 1.77 m/s; at 50 m it is 3.49 m/s. That gives a shear exponent of 0.422, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 1,099 to 4,289 kWh a year, 290% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.37 m/s1,099 kWhover 100 years
30 m2.81 m/s2,081 kWhover 100 years
40 m3.18 m/s3,153 kWhover 100 years
50 m3.49 m/s4,289 kWhover 100 years

Counties around Thurston County

5 of the 6 closest counties are windier at turbine height; the windiest, Grays Harbor County, averages 3.45 m/s.

Sun versus wind in Thurston County

Thurston County gets 3.47 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,013 kWh a year; one kW of the turbine above makes 207. Kilowatt for kilowatt, panels make 4.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.