Wind Turbine Payback in Tripp County, SD

Wind turbine payback in Tripp County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Tripp County, SD averages 6.49 m/s (14.5 mph). A 10 kW turbine there would make about 23,333 kWh a year, worth $3,402 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Tripp County

A home turbine is not worth buying for savings in Tripp County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.49 m/s here. Per kW, solar panels would make about 1,235 kWh a year here against the turbine's 2,333, so get a solar quote first.

What would have to change

Against the rest of SD

Tripp County is the 219th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Tripp County

January is the strongest month here, at 6.87 m/s and about 2,217 kWh. July is the weakest, 5.67 m/s and 1,466 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Tripp County.

MonthWind at 30 mOutputWorth
January6.87 m/s2,217 kWh$323
February6.49 m/s1,791 kWh$261
March6.71 m/s2,117 kWh$309
April6.92 m/s2,177 kWh$317
May6.59 m/s2,045 kWh$298
June6.01 m/s1,625 kWh$237
July5.67 m/s1,466 kWh$214
August5.79 m/s1,544 kWh$225
September6.49 m/s1,919 kWh$280
October6.82 m/s2,189 kWh$319
November6.79 m/s2,097 kWh$306
December6.73 m/s2,128 kWh$310

What a taller tower would buy

Measured at 10 m the wind in Tripp County averages 5.12 m/s; at 50 m it is 7.25 m/s. That gives a shear exponent of 0.216, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,320 to 28,811 kWh a year, 49% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.95 m/s19,320 kWh36 years
30 m6.49 m/s23,353 kWh29 years
40 m6.91 m/s26,389 kWh26 years
50 m7.25 m/s28,811 kWh24 years

Counties around Tripp County

4 of the 6 closest counties are windier at turbine height; the windiest, Todd County, averages 6.77 m/s.

Sun versus wind in Tripp County

Tripp County gets 4.23 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,235 kWh a year; one kW of the turbine above makes 2,333. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.