TurbinePayback

Wind Turbine Payback in Mellette County, SD

Wind turbine payback in Mellette County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mellette County, SD averages 6.55 m/s (14.7 mph). A 10 kW turbine there would make about 23,775 kWh a year, worth $3,466 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Mellette County

A home turbine is not worth buying for savings in Mellette County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.55 m/s here. Per kW, solar panels would make about 1,253 kWh a year here against the turbine's 2,378, so get a solar quote first.

What would have to change

Against the rest of SD

Mellette County is the 151st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Mellette County

January is the strongest month here, at 7.04 m/s and about 2,323 kWh. July is the weakest, 5.68 m/s and 1,474 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Mellette County.

MonthWind at 30 mOutputWorth
January7.04 m/s2,323 kWh$339
February6.60 m/s1,854 kWh$270
March6.76 m/s2,153 kWh$314
April6.96 m/s2,200 kWh$321
May6.58 m/s2,036 kWh$297
June6.02 m/s1,632 kWh$238
July5.68 m/s1,474 kWh$215
August5.81 m/s1,552 kWh$226
September6.49 m/s1,916 kWh$279
October6.89 m/s2,230 kWh$325
November6.93 m/s2,179 kWh$318
December6.91 m/s2,241 kWh$327

What a taller tower would buy

Measured at 10 m the wind in Mellette County averages 5.17 m/s; at 50 m it is 7.31 m/s. That gives a shear exponent of 0.215, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,725 to 29,229 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6 m/s19,725 kWh35 years
30 m6.55 m/s23,773 kWh29 years
40 m6.97 m/s26,811 kWh26 years
50 m7.31 m/s29,229 kWh24 years

Counties around Mellette County

2 of the 6 closest counties are windier at turbine height; the windiest, Todd County, averages 6.77 m/s.

Sun versus wind in Mellette County

Mellette County gets 4.29 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,253 kWh a year; one kW of the turbine above makes 2,378. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.