Wind Turbine Payback in Tulare County, CA

Wind turbine payback in Tulare County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Tulare County, CA averages 3.06 m/s (6.8 mph). A 10 kW turbine there would make about 2,782 kWh a year, worth $906 at CA's 32.58¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Tulare County

A home turbine is not worth buying for savings in Tulare County unless your spot is far windier than the county average, 5.4 m/s at the hub against 3.06 m/s here. Per kW, solar panels would make about 1,580 kWh a year here against the turbine's 278, so get a solar quote first.

What would have to change

Against the rest of CA

Tulare County is the 3,023rd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CA is San Francisco County at 6.53 m/s, payback 13 years.

Month by month in Tulare County

April is the strongest month here, at 3.32 m/s and about 299 kWh. August is the weakest, 2.80 m/s and 174 kWh, so the best month makes 1.7 times the worst. November to March brings in 41% of the year's output in Tulare County.

MonthWind at 30 mOutputWorth
January3.15 m/s261 kWh$85
February3.01 m/s202 kWh$66
March3.09 m/s246 kWh$80
April3.32 m/s299 kWh$97
May3.27 m/s295 kWh$96
June3.22 m/s272 kWh$89
July2.85 m/s186 kWh$61
August2.80 m/s174 kWh$57
September2.98 m/s210 kWh$68
October3.00 m/s222 kWh$72
November3.00 m/s214 kWh$70
December2.95 m/s208 kWh$68

What a taller tower would buy

Measured at 10 m the wind in Tulare County averages 2.58 m/s; at 50 m it is 3.31 m/s. That gives a shear exponent of 0.155, typical of very open, smooth ground where height adds little. Going from 20 m to 50 m takes output from 2,237 to 3,612 kWh a year, 61% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m2.87 m/s2,237 kWhover 100 years
30 m3.06 m/s2,776 kWhover 100 years
40 m3.2 m/s3,223 kWh95 years
50 m3.31 m/s3,612 kWh85 years

Counties around Tulare County

4 of the 6 closest counties are windier at turbine height; the windiest, San Luis Obispo County, averages 4.12 m/s.

Sun versus wind in Tulare County

Tulare County gets 5.41 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,580 kWh a year; one kW of the turbine above makes 278. Kilowatt for kilowatt, panels make 5.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.