Wind Turbine Payback in Twin Falls County, ID

Wind turbine payback in Twin Falls County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Twin Falls County, ID averages 5.3 m/s (11.9 mph). A 10 kW turbine there would make about 14,608 kWh a year, worth $1,902 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of 53 years, and the turbine is built to last about 20.

What to do in Twin Falls County

A home turbine is not worth buying for savings in Twin Falls County unless your spot is far windier than the county average, 8.7 m/s at the hub against 5.3 m/s here. Per kW, solar panels would make about 1,352 kWh a year here against the turbine's 1,461, so get a solar quote first.

What would have to change

Against the rest of ID

Twin Falls County is the 1,324th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Twin Falls County

March is the strongest month here, at 5.94 m/s and about 1,635 kWh. August is the weakest, 4.47 m/s and 780 kWh, so the best month makes 2.1 times the worst. November to March brings in 50% of the year's output in Twin Falls County.

MonthWind at 30 mOutputWorth
January5.67 m/s1,469 kWh$191
February5.84 m/s1,422 kWh$185
March5.94 m/s1,635 kWh$213
April5.68 m/s1,427 kWh$186
May5.05 m/s1,094 kWh$142
June4.98 m/s1,019 kWh$133
July4.50 m/s794 kWh$103
August4.47 m/s780 kWh$102
September4.79 m/s914 kWh$119
October5.36 m/s1,278 kWh$166
November5.66 m/s1,416 kWh$184
December5.71 m/s1,491 kWh$194

What a taller tower would buy

Measured at 10 m the wind in Twin Falls County averages 4.1 m/s; at 50 m it is 5.97 m/s. That gives a shear exponent of 0.233, typical of ordinary open country. Going from 20 m to 50 m takes output from 11,356 to 19,482 kWh a year, 72% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.82 m/s11,356 kWh68 years
30 m5.3 m/s14,609 kWh53 years
40 m5.67 m/s17,254 kWh45 years
50 m5.97 m/s19,482 kWh39 years

Counties around Twin Falls County

1 of the 6 closest counties is windier at turbine height; the windiest, Owyhee County, averages 5.38 m/s.

Sun versus wind in Twin Falls County

Twin Falls County gets 4.63 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,352 kWh a year; one kW of the turbine above makes 1,461. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.