TurbinePayback

Wind Turbine Payback in Lincoln County, ID

Wind turbine payback in Lincoln County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Lincoln County, ID averages 4.97 m/s (11.1 mph). A 10 kW turbine there would make about 12,333 kWh a year, worth $1,606 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of 62 years, and the turbine is built to last about 20.

What to do in Lincoln County

A home turbine is not worth buying for savings in Lincoln County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.97 m/s here. Per kW, solar panels would make about 1,352 kWh a year here against the turbine's 1,233, so get a solar quote first.

What would have to change

Against the rest of ID

Lincoln County is the 1,467th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Lincoln County

March is the strongest month here, at 5.23 m/s and about 1,200 kWh. September is the weakest, 4.59 m/s and 813 kWh, so the best month makes 1.5 times the worst. November to March brings in 44% of the year's output in Lincoln County.

MonthWind at 30 mOutputWorth
January5.13 m/s1,143 kWh$149
February5.11 m/s1,018 kWh$133
March5.23 m/s1,200 kWh$156
April5.22 m/s1,157 kWh$151
May4.97 m/s1,050 kWh$137
June5.13 m/s1,106 kWh$144
July4.81 m/s960 kWh$125
August4.68 m/s887 kWh$115
September4.59 m/s813 kWh$106
October4.78 m/s940 kWh$122
November5.06 m/s1,066 kWh$139
December4.92 m/s1,019 kWh$133

What a taller tower would buy

Measured at 10 m the wind in Lincoln County averages 3.88 m/s; at 50 m it is 5.57 m/s. That gives a shear exponent of 0.225, typical of ordinary open country. Going from 20 m to 50 m takes output from 9,533 to 16,544 kWh a year, 74% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.53 m/s9,533 kWh81 years
30 m4.97 m/s12,301 kWh62 years
40 m5.3 m/s14,589 kWh53 years
50 m5.57 m/s16,544 kWh46 years

Counties around Lincoln County

3 of the 6 closest counties are windier at turbine height; the windiest, Jerome County, averages 5.3 m/s.

Sun versus wind in Lincoln County

Lincoln County gets 4.63 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,352 kWh a year; one kW of the turbine above makes 1,233. Kilowatt for kilowatt, panels make 1.1 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.