Wind Turbine Payback in Winkler County, TX

Wind turbine payback in Winkler County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Winkler County, TX averages 5.77 m/s (12.9 mph). A 10 kW turbine there would make about 18,006 kWh a year, worth $2,886 at TX's 16.03¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Winkler County

A home turbine is not worth buying for savings in Winkler County unless your spot is far windier than the county average, 7.6 m/s at the hub against 5.77 m/s here. Per kW, solar panels would make about 1,641 kWh a year here against the turbine's 1,801, so get a solar quote first.

What would have to change

Against the rest of TX

Winkler County is the 1,088th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in TX is Dallam County at 6.82 m/s, payback 24 years.

Month by month in Winkler County

April is the strongest month here, at 6.61 m/s and about 1,993 kWh. August is the weakest, 5.14 m/s and 1,144 kWh, so the best month makes 1.7 times the worst. November to March brings in 42% of the year's output in Winkler County.

MonthWind at 30 mOutputWorth
January5.74 m/s1,509 kWh$242
February6.02 m/s1,525 kWh$244
March6.24 m/s1,824 kWh$292
April6.61 m/s1,993 kWh$319
May6.15 m/s1,767 kWh$283
June5.99 m/s1,612 kWh$258
July5.50 m/s1,365 kWh$219
August5.14 m/s1,144 kWh$183
September5.23 m/s1,159 kWh$186
October5.50 m/s1,359 kWh$218
November5.55 m/s1,348 kWh$216
December5.66 m/s1,459 kWh$234

What a taller tower would buy

Measured at 10 m the wind in Winkler County averages 4.55 m/s; at 50 m it is 6.45 m/s. That gives a shear exponent of 0.217, typical of ordinary open country. Going from 20 m to 50 m takes output from 14,516 to 23,038 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.29 m/s14,516 kWh43 years
30 m5.77 m/s18,029 kWh35 years
40 m6.15 m/s20,780 kWh30 years
50 m6.45 m/s23,038 kWh27 years

Counties around Winkler County

3 of the 6 closest counties are windier at turbine height; the windiest, Ector County, averages 6.12 m/s.

Sun versus wind in Winkler County

Winkler County gets 5.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,641 kWh a year; one kW of the turbine above makes 1,801. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.1 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.