Wind turbine payback in Wood County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Wood County, WI averages 6.06 m/s (13.6 mph). A 10 kW turbine there would make about 20,149 kWh a year, worth $3,838 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Wood County

A home turbine is not worth buying for savings in Wood County unless your spot is far windier than the county average, 6.9 m/s at the hub against 6.06 m/s here. Per kW, solar panels would make about 1,121 kWh a year here against the turbine's 2,015, so get a solar quote first.

What would have to change

Against the rest of WI

Wood County is the 747th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Wood County

April is the strongest month here, at 6.84 m/s and about 2,126 kWh. August is the weakest, 4.98 m/s and 1,052 kWh, so the best month makes 2.0 times the worst. November to March brings in 47% of the year's output in Wood County.

MonthWind at 30 mOutputWorth
January6.47 m/s1,969 kWh$375
February6.69 m/s1,905 kWh$363
March6.47 m/s1,969 kWh$375
April6.84 m/s2,126 kWh$405
May6.15 m/s1,767 kWh$337
June5.53 m/s1,337 kWh$255
July5.01 m/s1,072 kWh$204
August4.98 m/s1,052 kWh$200
September5.76 m/s1,477 kWh$281
October6.35 m/s1,897 kWh$361
November6.28 m/s1,792 kWh$341
December6.20 m/s1,801 kWh$343

What a taller tower would buy

Measured at 10 m the wind in Wood County averages 4.76 m/s; at 50 m it is 6.78 m/s. That gives a shear exponent of 0.220, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,342 to 25,457 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.54 m/s16,342 kWh32 years
30 m6.06 m/s20,144 kWh26 years
40 m6.46 m/s23,077 kWh23 years
50 m6.78 m/s25,457 kWh21 years

Counties around Wood County

3 of the 6 closest counties are windier at turbine height; the windiest, Adams County, averages 6.11 m/s.

Sun versus wind in Wood County

Wood County gets 3.84 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,121 kWh a year; one kW of the turbine above makes 2,015. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.