TurbinePayback

Wind Turbine Payback in Portage County, WI

Wind turbine payback in Portage County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Portage County, WI averages 6.07 m/s (13.6 mph). A 10 kW turbine there would make about 20,223 kWh a year, worth $3,852 at WI's 19.05¢/kWh. Against an installed cost of about $100,000, that is a payback of 26 years, and the turbine is built to last about 20.

What to do in Portage County

A home turbine is not worth buying for savings in Portage County unless your spot is far windier than the county average, 6.9 m/s at the hub against 6.07 m/s here. Per kW, solar panels would make about 1,115 kWh a year here against the turbine's 2,022, so get a solar quote first.

What would have to change

Against the rest of WI

Portage County is the 717th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WI is Manitowoc County at 7.32 m/s, payback 18 years.

Month by month in Portage County

April is the strongest month here, at 6.79 m/s and about 2,095 kWh. August is the weakest, 4.98 m/s and 1,054 kWh, so the best month makes 2.0 times the worst. November to March brings in 48% of the year's output in Portage County.

MonthWind at 30 mOutputWorth
January6.59 m/s2,043 kWh$389
February6.79 m/s1,956 kWh$373
March6.48 m/s1,977 kWh$377
April6.79 m/s2,095 kWh$399
May6.09 m/s1,729 kWh$329
June5.46 m/s1,297 kWh$247
July5.02 m/s1,075 kWh$205
August4.98 m/s1,054 kWh$201
September5.72 m/s1,451 kWh$276
October6.37 m/s1,909 kWh$364
November6.31 m/s1,810 kWh$345
December6.29 m/s1,859 kWh$354

What a taller tower would buy

Measured at 10 m the wind in Portage County averages 4.76 m/s; at 50 m it is 6.8 m/s. That gives a shear exponent of 0.222, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,387 to 25,602 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.55 m/s16,387 kWh32 years
30 m6.07 m/s20,230 kWh26 years
40 m6.47 m/s23,196 kWh23 years
50 m6.8 m/s25,602 kWh21 years

Counties around Portage County

1 of the 6 closest counties is windier at turbine height; the windiest, Adams County, averages 6.11 m/s.

Sun versus wind in Portage County

Portage County gets 3.82 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,115 kWh a year; one kW of the turbine above makes 2,022. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.8 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.