No. The turbine wears out before it pays for itself.
At 30 m, the height a home turbine tower usually reaches, the wind in Yakutat City and Borough, AK averages 3.62 m/s (8.1 mph). A 10 kW turbine there would make about 4,820 kWh a year, worth $1,317 at AK's 27.32¢/kWh. Against an installed cost of about $100,000, that is a payback of 76 years, and the turbine is built to last about 20.
What to do in Yakutat City and Borough
A home turbine is not worth buying for savings in Yakutat City and Borough unless your spot is far windier than the county average, 5.8 m/s at the hub against 3.62 m/s here. Per kW, solar panels would make about 896 kWh a year here against the turbine's 482, so get a solar quote first.
What would have to change
- Power would have to cost 104¢/kWh, 3.8 times what AK pays now.
- Or the average wind at the hub would have to be 5.8 m/s instead of 3.62. A taller tower or an exposed ridge can add some of that; a rooftop never will.
Against the rest of AK
Yakutat City and Borough is the 2,367th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AK is Aleutians West Census Area at 9.35 m/s, payback 9 years.
Month by month in Yakutat City and Borough
December is the strongest month here, at 4.74 m/s and about 922 kWh. July is the weakest, 2.34 m/s and 89 kWh, so the best month makes 10.4 times the worst. November to March brings in 65% of the year's output in Yakutat City and Borough.
| Month | Wind at 30 m | Output | Worth |
|---|---|---|---|
| January | 4.46 m/s | 775 kWh | $212 |
| February | 4.05 m/s | 524 kWh | $143 |
| March | 4.01 m/s | 564 kWh | $154 |
| April | 3.39 m/s | 322 kWh | $88 |
| May | 2.93 m/s | 205 kWh | $56 |
| June | 2.45 m/s | 102 kWh | $28 |
| July | 2.34 m/s | 89 kWh | $24 |
| August | 2.74 m/s | 161 kWh | $44 |
| September | 3.67 m/s | 412 kWh | $113 |
| October | 4.15 m/s | 626 kWh | $171 |
| November | 4.51 m/s | 773 kWh | $211 |
| December | 4.74 m/s | 922 kWh | $252 |
What a taller tower would buy
Measured at 10 m the wind in Yakutat City and Borough averages 3.15 m/s; at 50 m it is 3.86 m/s. That gives a shear exponent of 0.126, typical of very open, smooth ground where height adds little. Going from 20 m to 50 m takes output from 4,091 to 5,894 kWh a year, 44% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.
| Hub height | Average wind | Output | Payback |
|---|---|---|---|
| 20 m | 3.44 m/s | 4,091 kWh | 90 years |
| 30 m | 3.62 m/s | 4,817 kWh | 76 years |
| 40 m | 3.75 m/s | 5,400 kWh | 68 years |
| 50 m | 3.86 m/s | 5,894 kWh | 62 years |
Counties around Yakutat City and Borough
4 of the 6 closest counties are windier at turbine height; the windiest, Chugach Census Area, averages 6.07 m/s.
- Skagway Municipality, AK: 2.81 m/s, 2,073 kWh, payback over 100 years (179 mi)
- Haines Borough, AK: 3.76 m/s, 5,432 kWh, payback 67 years (181 mi)
- Copper River Census Area, AK: 2.86 m/s, 2,205 kWh, payback over 100 years (182 mi)
- Hoonah-Angoon Census Area, AK: 4.48 m/s, 9,219 kWh, payback 40 years (195 mi)
- Chugach Census Area, AK: 6.07 m/s, 20,223 kWh, payback 18 years (201 mi)
- Juneau City and Borough, AK: 3.89 m/s, 6,037 kWh, payback 61 years (248 mi)
Sun versus wind in Yakutat City and Borough
Yakutat City and Borough gets 3.07 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 896 kWh a year; one kW of the turbine above makes 482. Kilowatt for kilowatt, panels make 1.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.
How this is worked out
Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.