Wind Turbine Payback in Yavapai County, AZ

Wind turbine payback in Yavapai County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Yavapai County, AZ averages 4.44 m/s (9.9 mph). A 10 kW turbine there would make about 8,982 kWh a year, worth $1,380 at AZ's 15.36¢/kWh. Against an installed cost of about $100,000, that is a payback of 73 years, and the turbine is built to last about 20.

What to do in Yavapai County

A home turbine is not worth buying for savings in Yavapai County unless your spot is far windier than the county average, 7.8 m/s at the hub against 4.44 m/s here. Per kW, solar panels would make about 1,664 kWh a year here against the turbine's 898, so get a solar quote first.

What would have to change

Against the rest of AZ

Yavapai County is the 1,788th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AZ is Apache County at 5.25 m/s, payback 46 years.

Month by month in Yavapai County

April is the strongest month here, at 5.05 m/s and about 1,059 kWh. August is the weakest, 3.45 m/s and 352 kWh, so the best month makes 3.0 times the worst. November to March brings in 47% of the year's output in Yavapai County.

MonthWind at 30 mOutputWorth
January4.87 m/s989 kWh$152
February4.67 m/s798 kWh$123
March4.69 m/s893 kWh$137
April5.05 m/s1,059 kWh$163
May4.75 m/s926 kWh$142
June4.59 m/s814 kWh$125
July3.64 m/s416 kWh$64
August3.45 m/s352 kWh$54
September3.99 m/s537 kWh$82
October4.48 m/s782 kWh$120
November4.56 m/s796 kWh$122
December4.62 m/s855 kWh$131

What a taller tower would buy

Measured at 10 m the wind in Yavapai County averages 3.4 m/s; at 50 m it is 5.03 m/s. That gives a shear exponent of 0.243, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,708 to 12,737 kWh a year, 90% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.03 m/s6,708 kWh97 years
30 m4.44 m/s8,999 kWh72 years
40 m4.76 m/s10,983 kWh59 years
50 m5.03 m/s12,737 kWh51 years

Counties around Yavapai County

2 of the 6 closest counties are windier at turbine height; the windiest, Mohave County, averages 4.69 m/s.

Sun versus wind in Yavapai County

Yavapai County gets 5.7 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,664 kWh a year; one kW of the turbine above makes 898. Kilowatt for kilowatt, panels make 1.9 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.