Wind Turbine Payback in Mohave County, AZ

Wind turbine payback in Mohave County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Mohave County, AZ averages 4.69 m/s (10.5 mph). A 10 kW turbine there would make about 10,508 kWh a year, worth $1,614 at AZ's 15.36¢/kWh. Against an installed cost of about $100,000, that is a payback of 62 years, and the turbine is built to last about 20.

What to do in Mohave County

A home turbine is not worth buying for savings in Mohave County unless your spot is far windier than the county average, 7.8 m/s at the hub against 4.69 m/s here. Per kW, solar panels would make about 1,641 kWh a year here against the turbine's 1,051, so get a solar quote first.

What would have to change

Against the rest of AZ

Mohave County is the 1,626th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in AZ is Apache County at 5.25 m/s, payback 46 years.

Month by month in Mohave County

April is the strongest month here, at 5.28 m/s and about 1,189 kWh. August is the weakest, 4.18 m/s and 636 kWh, so the best month makes 1.9 times the worst. November to March brings in 41% of the year's output in Mohave County.

MonthWind at 30 mOutputWorth
January4.69 m/s893 kWh$137
February4.70 m/s811 kWh$125
March4.85 m/s982 kWh$151
April5.28 m/s1,189 kWh$183
May5.03 m/s1,080 kWh$166
June5.15 m/s1,116 kWh$171
July4.18 m/s640 kWh$98
August4.18 m/s636 kWh$98
September4.39 m/s715 kWh$110
October4.62 m/s855 kWh$131
November4.66 m/s846 kWh$130
December4.59 m/s840 kWh$129

What a taller tower would buy

Measured at 10 m the wind in Mohave County averages 3.79 m/s; at 50 m it is 5.18 m/s. That gives a shear exponent of 0.194, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,382 to 13,768 kWh a year, 64% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.34 m/s8,382 kWh78 years
30 m4.69 m/s10,516 kWh62 years
40 m4.96 m/s12,269 kWh53 years
50 m5.18 m/s13,768 kWh47 years

Counties around Mohave County

2 of the 6 closest counties are windier at turbine height; the windiest, Washington County, averages 5.14 m/s.

Sun versus wind in Mohave County

Mohave County gets 5.62 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,641 kWh a year; one kW of the turbine above makes 1,051. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.