Wind Turbine Payback in Yellowstone County, MT

Wind turbine payback in Yellowstone County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Yellowstone County, MT averages 5.74 m/s (12.8 mph). A 10 kW turbine there would make about 17,785 kWh a year, worth $2,513 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 40 years, and the turbine is built to last about 20.

What to do in Yellowstone County

A home turbine is not worth buying for savings in Yellowstone County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.74 m/s here. Per kW, solar panels would make about 1,203 kWh a year here against the turbine's 1,779, so get a solar quote first.

What would have to change

Against the rest of MT

Yellowstone County is the 1,116th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Yellowstone County

January is the strongest month here, at 6.90 m/s and about 2,236 kWh. July is the weakest, 4.60 m/s and 846 kWh, so the best month makes 2.6 times the worst. November to March brings in 53% of the year's output in Yellowstone County.

MonthWind at 30 mOutputWorth
January6.90 m/s2,236 kWh$316
February6.15 m/s1,595 kWh$225
March5.95 m/s1,643 kWh$232
April5.73 m/s1,455 kWh$206
May5.40 m/s1,302 kWh$184
June5.04 m/s1,051 kWh$149
July4.60 m/s846 kWh$120
August4.69 m/s893 kWh$126
September5.18 m/s1,131 kWh$160
October6.02 m/s1,687 kWh$238
November6.60 m/s1,983 kWh$280
December6.59 m/s2,044 kWh$289

What a taller tower would buy

Measured at 10 m the wind in Yellowstone County averages 4.43 m/s; at 50 m it is 6.47 m/s. That gives a shear exponent of 0.235, typical of ordinary open country. Going from 20 m to 50 m takes output from 14,023 to 23,186 kWh a year, 65% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.22 m/s14,023 kWh51 years
30 m5.74 m/s17,771 kWh40 years
40 m6.14 m/s20,738 kWh34 years
50 m6.47 m/s23,186 kWh31 years

Counties around Yellowstone County

3 of the 6 closest counties are windier at turbine height; the windiest, Golden Valley County, averages 6 m/s.

Sun versus wind in Yellowstone County

Yellowstone County gets 4.12 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,203 kWh a year; one kW of the turbine above makes 1,779. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.