Wind turbine payback in Golden Valley County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Golden Valley County, MT averages 6 m/s (13.4 mph). A 10 kW turbine there would make about 19,704 kWh a year, worth $2,784 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 36 years, and the turbine is built to last about 20.

What to do in Golden Valley County

A home turbine is not worth buying for savings in Golden Valley County unless your spot is far windier than the county average, 8.2 m/s at the hub against 6 m/s here. Per kW, solar panels would make about 1,183 kWh a year here against the turbine's 1,970, so get a solar quote first.

What would have to change

Against the rest of MT

Golden Valley County is the 840th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Golden Valley County

January is the strongest month here, at 7.59 m/s and about 2,645 kWh. July is the weakest, 4.64 m/s and 866 kWh, so the best month makes 3.1 times the worst. November to March brings in 55% of the year's output in Golden Valley County.

MonthWind at 30 mOutputWorth
January7.59 m/s2,645 kWh$374
February6.59 m/s1,845 kWh$261
March6.30 m/s1,860 kWh$263
April5.89 m/s1,552 kWh$219
May5.45 m/s1,329 kWh$188
June5.10 m/s1,087 kWh$154
July4.64 m/s866 kWh$122
August4.73 m/s913 kWh$129
September5.30 m/s1,198 kWh$169
October6.33 m/s1,882 kWh$266
November7.03 m/s2,241 kWh$317
December7.16 m/s2,390 kWh$338

What a taller tower would buy

Measured at 10 m the wind in Golden Valley County averages 4.62 m/s; at 50 m it is 6.78 m/s. That gives a shear exponent of 0.238, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,688 to 25,457 kWh a year, 62% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.45 m/s15,688 kWh45 years
30 m6 m/s19,733 kWh36 years
40 m6.43 m/s22,886 kWh31 years
50 m6.78 m/s25,457 kWh28 years

Counties around Golden Valley County

1 of the 6 closest counties is windier at turbine height; the windiest, Fergus County, averages 6.18 m/s.

Sun versus wind in Golden Valley County

Golden Valley County gets 4.05 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,183 kWh a year; one kW of the turbine above makes 1,970. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.