Wind Turbine Payback in Yuma County, CO

Wind turbine payback in Yuma County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Yuma County, CO averages 6.12 m/s (13.7 mph). A 10 kW turbine there would make about 20,594 kWh a year, worth $3,460 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Yuma County

A home turbine is not worth buying for savings in Yuma County unless your spot is far windier than the county average, 7.4 m/s at the hub against 6.12 m/s here. Per kW, solar panels would make about 1,384 kWh a year here against the turbine's 2,059, so get a solar quote first.

What would have to change

Against the rest of CO

Yuma County is the 664th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Yuma County

April is the strongest month here, at 6.76 m/s and about 2,083 kWh. July is the weakest, 5.39 m/s and 1,295 kWh, so the best month makes 1.6 times the worst. November to March brings in 45% of the year's output in Yuma County.

MonthWind at 30 mOutputWorth
January6.34 m/s1,890 kWh$318
February6.31 m/s1,687 kWh$283
March6.52 m/s2,002 kWh$336
April6.76 m/s2,083 kWh$350
May6.13 m/s1,756 kWh$295
June5.80 m/s1,498 kWh$252
July5.39 m/s1,295 kWh$218
August5.40 m/s1,300 kWh$218
September5.87 m/s1,541 kWh$259
October6.28 m/s1,851 kWh$311
November6.40 m/s1,862 kWh$313
December6.28 m/s1,851 kWh$311

What a taller tower would buy

Measured at 10 m the wind in Yuma County averages 4.79 m/s; at 50 m it is 6.86 m/s. That gives a shear exponent of 0.223, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,705 to 26,036 kWh a year, 56% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.59 m/s16,705 kWh36 years
30 m6.12 m/s20,604 kWh29 years
40 m6.53 m/s23,606 kWh25 years
50 m6.86 m/s26,036 kWh23 years

Counties around Yuma County

5 of the 6 closest counties are windier at turbine height; the windiest, Chase County, averages 6.23 m/s.

Sun versus wind in Yuma County

Yuma County gets 4.74 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,384 kWh a year; one kW of the turbine above makes 2,059. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.