TurbinePayback

Wind Turbine Payback in Barnes County, ND

Wind turbine payback in Barnes County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Barnes County, ND averages 6.44 m/s (14.4 mph). A 10 kW turbine there would make about 22,964 kWh a year, worth $2,861 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Barnes County

A home turbine is not worth buying for savings in Barnes County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.44 m/s here. Per kW, solar panels would make about 1,171 kWh a year here against the turbine's 2,296, so get a solar quote first.

What would have to change

Against the rest of ND

Barnes County is the 280th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Barnes County

October is the strongest month here, at 7.05 m/s and about 2,325 kWh. July is the weakest, 5.55 m/s and 1,395 kWh, so the best month makes 1.7 times the worst. November to March brings in 43% of the year's output in Barnes County.

MonthWind at 30 mOutputWorth
January6.55 m/s2,020 kWh$252
February6.42 m/s1,749 kWh$218
March6.64 m/s2,076 kWh$259
April6.89 m/s2,160 kWh$269
May6.77 m/s2,154 kWh$268
June6.13 m/s1,698 kWh$212
July5.55 m/s1,395 kWh$174
August5.70 m/s1,484 kWh$185
September6.56 m/s1,961 kWh$244
October7.05 m/s2,325 kWh$290
November6.71 m/s2,053 kWh$256
December6.43 m/s1,942 kWh$242

What a taller tower would buy

Measured at 10 m the wind in Barnes County averages 5.12 m/s; at 50 m it is 7.17 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,115 to 28,250 kWh a year, 48% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.92 m/s19,115 kWh42 years
30 m6.44 m/s22,994 kWh35 years
40 m6.84 m/s25,916 kWh31 years
50 m7.17 m/s28,250 kWh28 years

Counties around Barnes County

3 of the 6 closest counties are windier at turbine height; the windiest, LaMoure County, averages 6.61 m/s.

Sun versus wind in Barnes County

Barnes County gets 4.01 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,171 kWh a year; one kW of the turbine above makes 2,296. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.