TurbinePayback

Wind Turbine Payback in Benson County, ND

Wind turbine payback in Benson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Benson County, ND averages 6.44 m/s (14.4 mph). A 10 kW turbine there would make about 22,964 kWh a year, worth $2,861 at ND's 12.46¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Benson County

A home turbine is not worth buying for savings in Benson County unless your spot is far windier than the county average, 9.1 m/s at the hub against 6.44 m/s here. Per kW, solar panels would make about 1,130 kWh a year here against the turbine's 2,296, so get a solar quote first.

What would have to change

Against the rest of ND

Benson County is the 280th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ND is Bowman County at 6.79 m/s, payback 31 years.

Month by month in Benson County

October is the strongest month here, at 6.99 m/s and about 2,289 kWh. July is the weakest, 5.64 m/s and 1,450 kWh, so the best month makes 1.6 times the worst. November to March brings in 42% of the year's output in Benson County.

MonthWind at 30 mOutputWorth
January6.50 m/s1,988 kWh$248
February6.27 m/s1,663 kWh$207
March6.67 m/s2,095 kWh$261
April6.91 m/s2,167 kWh$270
May6.80 m/s2,173 kWh$271
June6.18 m/s1,726 kWh$215
July5.64 m/s1,450 kWh$181
August5.76 m/s1,523 kWh$190
September6.47 m/s1,907 kWh$238
October6.99 m/s2,289 kWh$285
November6.71 m/s2,049 kWh$255
December6.34 m/s1,886 kWh$235

What a taller tower would buy

Measured at 10 m the wind in Benson County averages 5.15 m/s; at 50 m it is 7.14 m/s. That gives a shear exponent of 0.203, typical of ordinary open country. Going from 20 m to 50 m takes output from 19,172 to 28,038 kWh a year, 46% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.93 m/s19,172 kWh42 years
30 m6.44 m/s22,940 kWh35 years
40 m6.82 m/s25,774 kWh31 years
50 m7.14 m/s28,038 kWh29 years

Counties around Benson County

4 of the 6 closest counties are windier at turbine height; the windiest, Ramsey County, averages 6.53 m/s.

Sun versus wind in Benson County

Benson County gets 3.87 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,130 kWh a year; one kW of the turbine above makes 2,296. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 2.0 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.