TurbinePayback

Wind Turbine Payback in Big Horn County, WY

Wind turbine payback in Big Horn County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Big Horn County, WY averages 4.34 m/s (9.7 mph). A 10 kW turbine there would make about 8,403 kWh a year, worth $1,177 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 85 years, and the turbine is built to last about 20.

What to do in Big Horn County

A home turbine is not worth buying for savings in Big Horn County unless your spot is far windier than the county average, 8.3 m/s at the hub against 4.34 m/s here. Per kW, solar panels would make about 1,276 kWh a year here against the turbine's 840, so get a solar quote first.

What would have to change

Against the rest of WY

Big Horn County is the 1,867th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Big Horn County

April is the strongest month here, at 4.73 m/s and about 883 kWh. August is the weakest, 3.90 m/s and 516 kWh, so the best month makes 1.7 times the worst. November to March brings in 45% of the year's output in Big Horn County.

MonthWind at 30 mOutputWorth
January4.49 m/s786 kWh$110
February4.41 m/s674 kWh$94
March4.61 m/s850 kWh$119
April4.73 m/s883 kWh$124
May4.43 m/s759 kWh$106
June4.17 m/s615 kWh$86
July3.97 m/s546 kWh$76
August3.90 m/s516 kWh$72
September4.14 m/s600 kWh$84
October4.40 m/s741 kWh$104
November4.44 m/s739 kWh$104
December4.44 m/s764 kWh$107

What a taller tower would buy

Measured at 10 m the wind in Big Horn County averages 3.38 m/s; at 50 m it is 4.88 m/s. That gives a shear exponent of 0.228, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,378 to 11,734 kWh a year, 84% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.96 m/s6,378 kWhover 100 years
30 m4.34 m/s8,423 kWh85 years
40 m4.64 m/s10,182 kWh70 years
50 m4.88 m/s11,734 kWh61 years

Counties around Big Horn County

6 of the 6 closest counties are windier at turbine height; the windiest, Sheridan County, averages 5.63 m/s.

Sun versus wind in Big Horn County

Big Horn County gets 4.37 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,276 kWh a year; one kW of the turbine above makes 840. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.