Wind Turbine Payback in Sheridan County, WY

Wind turbine payback in Sheridan County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Sheridan County, WY averages 5.63 m/s (12.6 mph). A 10 kW turbine there would make about 16,980 kWh a year, worth $2,379 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 42 years, and the turbine is built to last about 20.

What to do in Sheridan County

A home turbine is not worth buying for savings in Sheridan County unless your spot is far windier than the county average, 8.3 m/s at the hub against 5.63 m/s here. Per kW, solar panels would make about 1,253 kWh a year here against the turbine's 1,698, so get a solar quote first.

What would have to change

Against the rest of WY

Sheridan County is the 1,151st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Sheridan County

January is the strongest month here, at 6.78 m/s and about 2,165 kWh. July is the weakest, 4.55 m/s and 820 kWh, so the best month makes 2.6 times the worst. November to March brings in 54% of the year's output in Sheridan County.

MonthWind at 30 mOutputWorth
January6.78 m/s2,165 kWh$303
February6.26 m/s1,659 kWh$232
March5.96 m/s1,647 kWh$231
April5.57 m/s1,357 kWh$190
May5.25 m/s1,214 kWh$170
June4.88 m/s965 kWh$135
July4.55 m/s820 kWh$115
August4.72 m/s909 kWh$127
September5.07 m/s1,068 kWh$150
October5.86 m/s1,585 kWh$222
November6.14 m/s1,702 kWh$238
December6.47 m/s1,971 kWh$276

What a taller tower would buy

Measured at 10 m the wind in Sheridan County averages 4.37 m/s; at 50 m it is 6.33 m/s. That gives a shear exponent of 0.230, typical of ordinary open country. Going from 20 m to 50 m takes output from 13,402 to 22,151 kWh a year, 65% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.13 m/s13,402 kWh53 years
30 m5.63 m/s16,968 kWh42 years
40 m6.01 m/s19,803 kWh36 years
50 m6.33 m/s22,151 kWh32 years

Counties around Sheridan County

2 of the 6 closest counties are windier at turbine height; the windiest, Powder River County, averages 6.12 m/s.

Sun versus wind in Sheridan County

Sheridan County gets 4.29 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,253 kWh a year; one kW of the turbine above makes 1,698. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.