TurbinePayback

Wind Turbine Payback in Washakie County, WY

Wind turbine payback in Washakie County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Washakie County, WY averages 4.36 m/s (9.8 mph). A 10 kW turbine there would make about 8,517 kWh a year, worth $1,193 at WY's 14.01¢/kWh. Against an installed cost of about $100,000, that is a payback of 84 years, and the turbine is built to last about 20.

What to do in Washakie County

A home turbine is not worth buying for savings in Washakie County unless your spot is far windier than the county average, 8.3 m/s at the hub against 4.36 m/s here. Per kW, solar panels would make about 1,332 kWh a year here against the turbine's 852, so get a solar quote first.

What would have to change

Against the rest of WY

Washakie County is the 1,851st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in WY is Albany County at 7.32 m/s, payback 24 years.

Month by month in Washakie County

March is the strongest month here, at 4.73 m/s and about 916 kWh. August is the weakest, 4.05 m/s and 579 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Washakie County.

MonthWind at 30 mOutputWorth
January4.31 m/s701 kWh$98
February4.42 m/s681 kWh$95
March4.73 m/s916 kWh$128
April4.69 m/s863 kWh$121
May4.56 m/s822 kWh$115
June4.42 m/s729 kWh$102
July4.08 m/s594 kWh$83
August4.05 m/s579 kWh$81
September4.21 m/s630 kWh$88
October4.27 m/s680 kWh$95
November4.26 m/s654 kWh$92
December4.27 m/s680 kWh$95

What a taller tower would buy

Measured at 10 m the wind in Washakie County averages 3.42 m/s; at 50 m it is 4.88 m/s. That gives a shear exponent of 0.221, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,504 to 11,734 kWh a year, 80% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.99 m/s6,504 kWhover 100 years
30 m4.36 m/s8,512 kWh84 years
40 m4.65 m/s10,227 kWh70 years
50 m4.88 m/s11,734 kWh61 years

Counties around Washakie County

5 of the 6 closest counties are windier at turbine height; the windiest, Natrona County, averages 6.38 m/s.

Sun versus wind in Washakie County

Washakie County gets 4.56 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,332 kWh a year; one kW of the turbine above makes 852. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.