At 30 m, the height a home turbine tower usually reaches, the wind in Blaine County, ID averages 4.2 m/s (9.4 mph). A 10 kW turbine there would make about 7,623 kWh a year, worth $993 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Blaine County

A home turbine is not worth buying for savings in Blaine County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.2 m/s here. Per kW, solar panels would make about 1,329 kWh a year here against the turbine's 762, so get a solar quote first.

What would have to change

Against the rest of ID

Blaine County is the 1,951st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Blaine County

June is the strongest month here, at 4.59 m/s and about 811 kWh. January is the weakest, 3.58 m/s and 394 kWh, so the best month makes 2.1 times the worst. November to March brings in 35% of the year's output in Blaine County.

MonthWind at 30 mOutputWorth
January3.58 m/s394 kWh$51
February4.09 m/s540 kWh$70
March4.49 m/s787 kWh$102
April4.52 m/s779 kWh$101
May4.46 m/s773 kWh$101
June4.59 m/s811 kWh$106
July4.51 m/s796 kWh$104
August4.32 m/s702 kWh$91
September4.09 m/s578 kWh$75
October4.09 m/s598 kWh$78
November3.87 m/s490 kWh$64
December3.78 m/s470 kWh$61

What a taller tower would buy

Measured at 10 m the wind in Blaine County averages 3.37 m/s; at 50 m it is 4.65 m/s. That gives a shear exponent of 0.200, typical of ordinary open country. Going from 20 m to 50 m takes output from 5,948 to 10,257 kWh a year, 72% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.87 m/s5,948 kWhover 100 years
30 m4.2 m/s7,615 kWhover 100 years
40 m4.45 m/s9,024 kWh85 years
50 m4.65 m/s10,257 kWh75 years

Counties around Blaine County

5 of the 6 closest counties are windier at turbine height; the windiest, Jerome County, averages 5.3 m/s.

Sun versus wind in Blaine County

Blaine County gets 4.55 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,329 kWh a year; one kW of the turbine above makes 762. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.