TurbinePayback

Wind Turbine Payback in Butte County, ID

Wind turbine payback in Butte County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Butte County, ID averages 4.32 m/s (9.7 mph). A 10 kW turbine there would make about 8,289 kWh a year, worth $1,079 at ID's 13.02¢/kWh. Against an installed cost of about $100,000, that is a payback of 93 years, and the turbine is built to last about 20.

What to do in Butte County

A home turbine is not worth buying for savings in Butte County unless your spot is far windier than the county average, 8.7 m/s at the hub against 4.32 m/s here. Per kW, solar panels would make about 1,329 kWh a year here against the turbine's 829, so get a solar quote first.

What would have to change

Against the rest of ID

Butte County is the 1,882nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in ID is Owyhee County at 5.38 m/s, payback 51 years.

Month by month in Butte County

March is the strongest month here, at 4.71 m/s and about 905 kWh. January is the weakest, 3.69 m/s and 433 kWh, so the best month makes 2.1 times the worst. November to March brings in 36% of the year's output in Butte County.

MonthWind at 30 mOutputWorth
January3.69 m/s433 kWh$56
February4.28 m/s619 kWh$81
March4.71 m/s905 kWh$118
April4.73 m/s885 kWh$115
May4.58 m/s833 kWh$108
June4.71 m/s875 kWh$114
July4.49 m/s787 kWh$102
August4.34 m/s715 kWh$93
September4.18 m/s618 kWh$80
October4.18 m/s639 kWh$83
November4.02 m/s548 kWh$71
December3.93 m/s529 kWh$69

What a taller tower would buy

Measured at 10 m the wind in Butte County averages 3.45 m/s; at 50 m it is 4.79 m/s. That gives a shear exponent of 0.204, typical of ordinary open country. Going from 20 m to 50 m takes output from 6,444 to 11,147 kWh a year, 73% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.97 m/s6,444 kWhover 100 years
30 m4.32 m/s8,266 kWh93 years
40 m4.58 m/s9,804 kWh78 years
50 m4.79 m/s11,147 kWh69 years

Counties around Butte County

2 of the 6 closest counties are windier at turbine height; the windiest, Minidoka County, averages 4.93 m/s.

Sun versus wind in Butte County

Butte County gets 4.55 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,329 kWh a year; one kW of the turbine above makes 829. Kilowatt for kilowatt, panels make 1.6 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.