Wind Turbine Payback in Cheyenne County, CO

Wind turbine payback in Cheyenne County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cheyenne County, CO averages 6.14 m/s (13.7 mph). A 10 kW turbine there would make about 20,742 kWh a year, worth $3,485 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 29 years, and the turbine is built to last about 20.

What to do in Cheyenne County

A home turbine is not worth buying for savings in Cheyenne County unless your spot is far windier than the county average, 7.4 m/s at the hub against 6.14 m/s here. Per kW, solar panels would make about 1,472 kWh a year here against the turbine's 2,074, so get a solar quote first.

What would have to change

Against the rest of CO

Cheyenne County is the 646th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Cheyenne County

April is the strongest month here, at 6.91 m/s and about 2,171 kWh. August is the weakest, 5.45 m/s and 1,334 kWh, so the best month makes 1.6 times the worst. November to March brings in 43% of the year's output in Cheyenne County.

MonthWind at 30 mOutputWorth
January6.12 m/s1,747 kWh$293
February6.21 m/s1,634 kWh$275
March6.52 m/s2,000 kWh$336
April6.91 m/s2,171 kWh$365
May6.29 m/s1,854 kWh$311
June6.01 m/s1,625 kWh$273
July5.48 m/s1,351 kWh$227
August5.45 m/s1,334 kWh$224
September6.06 m/s1,658 kWh$279
October6.24 m/s1,825 kWh$307
November6.29 m/s1,799 kWh$302
December6.17 m/s1,780 kWh$299

What a taller tower would buy

Measured at 10 m the wind in Cheyenne County averages 4.83 m/s; at 50 m it is 6.87 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,914 to 26,109 kWh a year, 54% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.62 m/s16,914 kWh35 years
30 m6.14 m/s20,764 kWh29 years
40 m6.54 m/s23,719 kWh25 years
50 m6.87 m/s26,109 kWh23 years

Counties around Cheyenne County

4 of the 6 closest counties are windier at turbine height; the windiest, Wallace County, averages 6.3 m/s.

Sun versus wind in Cheyenne County

Cheyenne County gets 5.04 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,472 kWh a year; one kW of the turbine above makes 2,074. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.