No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Kiowa County, CO averages 5.95 m/s (13.3 mph). A 10 kW turbine there would make about 19,334 kWh a year, worth $3,248 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Kiowa County

A home turbine is not worth buying for savings in Kiowa County unless your spot is far windier than the county average, 7.4 m/s at the hub against 5.95 m/s here. Per kW, solar panels would make about 1,472 kWh a year here against the turbine's 1,933, so get a solar quote first.

What would have to change

Against the rest of CO

Kiowa County is the 914th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Kiowa County

April is the strongest month here, at 6.76 m/s and about 2,080 kWh. August is the weakest, 5.40 m/s and 1,301 kWh, so the best month makes 1.6 times the worst. November to March brings in 41% of the year's output in Kiowa County.

MonthWind at 30 mOutputWorth
January5.67 m/s1,466 kWh$246
February5.92 m/s1,466 kWh$246
March6.31 m/s1,870 kWh$314
April6.76 m/s2,080 kWh$349
May6.20 m/s1,797 kWh$302
June6.03 m/s1,636 kWh$275
July5.47 m/s1,345 kWh$226
August5.40 m/s1,301 kWh$219
September6.01 m/s1,625 kWh$273
October5.98 m/s1,662 kWh$279
November5.97 m/s1,603 kWh$269
December5.77 m/s1,528 kWh$257

What a taller tower would buy

Measured at 10 m the wind in Kiowa County averages 4.68 m/s; at 50 m it is 6.66 m/s. That gives a shear exponent of 0.219, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,671 to 24,582 kWh a year, 57% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.45 m/s15,671 kWh38 years
30 m5.96 m/s19,372 kWh31 years
40 m6.34 m/s22,243 kWh27 years
50 m6.66 m/s24,582 kWh24 years

Counties around Kiowa County

3 of the 6 closest counties are windier at turbine height; the windiest, Greeley County, averages 6.26 m/s.

Sun versus wind in Kiowa County

Kiowa County gets 5.04 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,472 kWh a year; one kW of the turbine above makes 1,933. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.3 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.