Wind Turbine Payback in Christian County, MO

Wind turbine payback in Christian County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Christian County, MO averages 4.56 m/s (10.2 mph). A 10 kW turbine there would make about 9,702 kWh a year, worth $1,385 at MO's 14.28¢/kWh. Against an installed cost of about $100,000, that is a payback of 72 years, and the turbine is built to last about 20.

What to do in Christian County

A home turbine is not worth buying for savings in Christian County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.56 m/s here. Per kW, solar panels would make about 1,285 kWh a year here against the turbine's 970, so get a solar quote first.

What would have to change

Against the rest of MO

Christian County is the 1,711th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MO is Atchison County at 6.17 m/s, payback 33 years.

Month by month in Christian County

March is the strongest month here, at 5.29 m/s and about 1,233 kWh. July is the weakest, 3.47 m/s and 359 kWh, so the best month makes 3.4 times the worst. November to March brings in 54% of the year's output in Christian County.

MonthWind at 30 mOutputWorth
January5.08 m/s1,112 kWh$159
February5.20 m/s1,068 kWh$153
March5.29 m/s1,233 kWh$176
April5.33 m/s1,218 kWh$174
May4.55 m/s817 kWh$117
June3.98 m/s534 kWh$76
July3.47 m/s359 kWh$51
August3.56 m/s388 kWh$55
September3.91 m/s503 kWh$72
October4.58 m/s835 kWh$119
November4.91 m/s982 kWh$140
December4.91 m/s1,015 kWh$145

What a taller tower would buy

Measured at 10 m the wind in Christian County averages 3.23 m/s; at 50 m it is 5.36 m/s. That gives a shear exponent of 0.315, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 6,659 to 15,034 kWh a year, 126% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.02 m/s6,659 kWhover 100 years
30 m4.56 m/s9,722 kWh72 years
40 m5 m/s12,509 kWh56 years
50 m5.36 m/s15,034 kWh47 years

Counties around Christian County

3 of the 6 closest counties are windier at turbine height; the windiest, Lawrence County, averages 5.5 m/s.

Sun versus wind in Christian County

Christian County gets 4.4 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,285 kWh a year; one kW of the turbine above makes 970. Kilowatt for kilowatt, panels make 1.3 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.