Wind Turbine Payback in Clark County, NV

Wind turbine payback in Clark County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Clark County, NV averages 4.7 m/s (10.5 mph). A 10 kW turbine there would make about 10,571 kWh a year, worth $1,412 at NV's 13.36¢/kWh. Against an installed cost of about $100,000, that is a payback of 71 years, and the turbine is built to last about 20.

What to do in Clark County

A home turbine is not worth buying for savings in Clark County unless your spot is far windier than the county average, 8.6 m/s at the hub against 4.7 m/s here. Per kW, solar panels would make about 1,638 kWh a year here against the turbine's 1,057, so get a solar quote first.

What would have to change

Against the rest of NV

Clark County is the 1,610th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NV is Nye County at 4.71 m/s, payback 70 years.

Month by month in Clark County

April is the strongest month here, at 5.38 m/s and about 1,248 kWh. September is the weakest, 4.20 m/s and 625 kWh, so the best month makes 2.0 times the worst. November to March brings in 40% of the year's output in Clark County.

MonthWind at 30 mOutputWorth
January4.79 m/s946 kWh$126
February4.65 m/s785 kWh$105
March4.93 m/s1,026 kWh$137
April5.38 m/s1,248 kWh$167
May5.17 m/s1,161 kWh$155
June5.26 m/s1,175 kWh$157
July4.41 m/s749 kWh$100
August4.22 m/s659 kWh$88
September4.20 m/s625 kWh$84
October4.40 m/s745 kWh$100
November4.49 m/s764 kWh$102
December4.53 m/s808 kWh$108

What a taller tower would buy

Measured at 10 m the wind in Clark County averages 3.72 m/s; at 50 m it is 5.24 m/s. That gives a shear exponent of 0.213, typical of ordinary open country. Going from 20 m to 50 m takes output from 8,238 to 14,186 kWh a year, 72% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.31 m/s8,238 kWh91 years
30 m4.7 m/s10,570 kWh71 years
40 m5 m/s12,513 kWh60 years
50 m5.24 m/s14,186 kWh53 years

Counties around Clark County

2 of the 6 closest counties are windier at turbine height; the windiest, Washington County, averages 5.14 m/s.

Sun versus wind in Clark County

Clark County gets 5.61 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,638 kWh a year; one kW of the turbine above makes 1,057. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.