TurbinePayback

Wind Turbine Payback in Cotton County, OK

Wind turbine payback in Cotton County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Cotton County, OK averages 6.06 m/s (13.6 mph). A 10 kW turbine there would make about 20,149 kWh a year, worth $2,783 at OK's 13.81¢/kWh. Against an installed cost of about $100,000, that is a payback of 36 years, and the turbine is built to last about 20.

What to do in Cotton County

A home turbine is not worth buying for savings in Cotton County unless your spot is far windier than the county average, 8.4 m/s at the hub against 6.06 m/s here. Per kW, solar panels would make about 1,442 kWh a year here against the turbine's 2,015, so get a solar quote first.

What would have to change

Against the rest of OK

Cotton County is the 747th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OK is Cimarron County at 6.82 m/s, payback 28 years.

Month by month in Cotton County

April is the strongest month here, at 7.04 m/s and about 2,245 kWh. August is the weakest, 5.04 m/s and 1,090 kWh, so the best month makes 2.1 times the worst. November to March brings in 45% of the year's output in Cotton County.

MonthWind at 30 mOutputWorth
January6.13 m/s1,752 kWh$242
February6.31 m/s1,689 kWh$233
March6.69 m/s2,108 kWh$291
April7.04 m/s2,245 kWh$310
May6.36 m/s1,903 kWh$263
June5.97 m/s1,599 kWh$221
July5.17 m/s1,162 kWh$160
August5.04 m/s1,090 kWh$151
September5.35 m/s1,232 kWh$170
October6.15 m/s1,769 kWh$244
November6.44 m/s1,890 kWh$261
December6.07 m/s1,719 kWh$237

What a taller tower would buy

Measured at 10 m the wind in Cotton County averages 4.68 m/s; at 50 m it is 6.84 m/s. That gives a shear exponent of 0.236, typical of ordinary open country. Going from 20 m to 50 m takes output from 16,108 to 25,892 kWh a year, 61% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.51 m/s16,108 kWh45 years
30 m6.06 m/s20,172 kWh36 years
40 m6.49 m/s23,327 kWh31 years
50 m6.84 m/s25,892 kWh28 years

Counties around Cotton County

2 of the 6 closest counties are windier at turbine height; the windiest, Comanche County, averages 6.07 m/s.

Sun versus wind in Cotton County

Cotton County gets 4.94 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,442 kWh a year; one kW of the turbine above makes 2,015. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.