TurbinePayback

Wind Turbine Payback in Jefferson County, OK

Wind turbine payback in Jefferson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, OK averages 5.94 m/s (13.3 mph). A 10 kW turbine there would make about 19,260 kWh a year, worth $2,660 at OK's 13.81¢/kWh. Against an installed cost of about $100,000, that is a payback of 38 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 8.4 m/s at the hub against 5.94 m/s here. Per kW, solar panels would make about 1,399 kWh a year here against the turbine's 1,926, so get a solar quote first.

What would have to change

Against the rest of OK

Jefferson County is the 934th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in OK is Cimarron County at 6.82 m/s, payback 28 years.

Month by month in Jefferson County

April is the strongest month here, at 6.95 m/s and about 2,191 kWh. August is the weakest, 4.93 m/s and 1,028 kWh, so the best month makes 2.1 times the worst. November to March brings in 46% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January6.03 m/s1,695 kWh$234
February6.22 m/s1,636 kWh$226
March6.59 m/s2,045 kWh$282
April6.95 m/s2,191 kWh$303
May6.27 m/s1,845 kWh$255
June5.86 m/s1,532 kWh$212
July5.09 m/s1,119 kWh$155
August4.93 m/s1,028 kWh$142
September5.17 m/s1,128 kWh$156
October5.99 m/s1,667 kWh$230
November6.30 m/s1,802 kWh$249
December5.97 m/s1,656 kWh$229

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 4.58 m/s; at 50 m it is 6.71 m/s. That gives a shear exponent of 0.237, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,320 to 24,947 kWh a year, 63% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.4 m/s15,320 kWh47 years
30 m5.94 m/s19,296 kWh38 years
40 m6.36 m/s22,405 kWh32 years
50 m6.71 m/s24,947 kWh29 years

Counties around Jefferson County

4 of the 6 closest counties are windier at turbine height; the windiest, Carter County, averages 6.07 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.79 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,399 kWh a year; one kW of the turbine above makes 1,926. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.4 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.