Wind Turbine Payback in Custer County, CO

Wind turbine payback in Custer County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Custer County, CO averages 4.56 m/s (10.2 mph). A 10 kW turbine there would make about 9,702 kWh a year, worth $1,630 at CO's 16.8¢/kWh. Against an installed cost of about $100,000, that is a payback of 61 years, and the turbine is built to last about 20.

What to do in Custer County

A home turbine is not worth buying for savings in Custer County unless your spot is far windier than the county average, 7.4 m/s at the hub against 4.56 m/s here. Per kW, solar panels would make about 1,460 kWh a year here against the turbine's 970, so get a solar quote first.

What would have to change

Against the rest of CO

Custer County is the 1,711th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in CO is Baca County at 6.65 m/s, payback 24 years.

Month by month in Custer County

April is the strongest month here, at 5.43 m/s and about 1,279 kWh. August is the weakest, 3.23 m/s and 283 kWh, so the best month makes 4.5 times the worst. November to March brings in 54% of the year's output in Custer County.

MonthWind at 30 mOutputWorth
January5.04 m/s1,086 kWh$182
February5.38 m/s1,164 kWh$196
March5.24 m/s1,208 kWh$203
April5.43 m/s1,279 kWh$215
May4.61 m/s851 kWh$143
June4.30 m/s670 kWh$113
July3.25 m/s288 kWh$48
August3.23 m/s283 kWh$48
September3.83 m/s474 kWh$80
October4.52 m/s804 kWh$135
November4.85 m/s947 kWh$159
December5.08 m/s1,112 kWh$187

What a taller tower would buy

Measured at 10 m the wind in Custer County averages 3.67 m/s; at 50 m it is 5.04 m/s. That gives a shear exponent of 0.197, typical of ordinary open country. Going from 20 m to 50 m takes output from 7,665 to 12,805 kWh a year, 67% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m4.21 m/s7,665 kWh78 years
30 m4.56 m/s9,686 kWh62 years
40 m4.82 m/s11,363 kWh52 years
50 m5.04 m/s12,805 kWh47 years

Counties around Custer County

5 of the 6 closest counties are windier at turbine height; the windiest, Huerfano County, averages 5.51 m/s.

Sun versus wind in Custer County

Custer County gets 5 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,460 kWh a year; one kW of the turbine above makes 970. Kilowatt for kilowatt, panels make 1.5 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.