Wind Turbine Payback in Deer Lodge County, MT

Wind turbine payback in Deer Lodge County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Deer Lodge County, MT averages 3.65 m/s (8.2 mph). A 10 kW turbine there would make about 4,948 kWh a year, worth $699 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Deer Lodge County

A home turbine is not worth buying for savings in Deer Lodge County unless your spot is far windier than the county average, 8.2 m/s at the hub against 3.65 m/s here. Per kW, solar panels would make about 1,171 kWh a year here against the turbine's 495, so get a solar quote first.

What would have to change

Against the rest of MT

Deer Lodge County is the 2,332nd windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Deer Lodge County

January is the strongest month here, at 4.35 m/s and about 716 kWh. August is the weakest, 2.91 m/s and 198 kWh, so the best month makes 3.6 times the worst. November to March brings in 60% of the year's output in Deer Lodge County.

MonthWind at 30 mOutputWorth
January4.35 m/s716 kWh$101
February4.07 m/s533 kWh$75
March4.10 m/s601 kWh$85
April3.71 m/s428 kWh$60
May3.25 m/s288 kWh$41
June3.12 m/s245 kWh$35
July2.91 m/s198 kWh$28
August2.91 m/s198 kWh$28
September3.23 m/s274 kWh$39
October3.80 m/s477 kWh$67
November4.17 m/s614 kWh$87
December4.19 m/s642 kWh$91

What a taller tower would buy

Measured at 10 m the wind in Deer Lodge County averages 2.42 m/s; at 50 m it is 4.42 m/s. That gives a shear exponent of 0.374, typical of rough, sheltered ground: trees or buildings slow the low wind a lot. Going from 20 m to 50 m takes output from 3,026 to 8,865 kWh a year, 193% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.14 m/s3,026 kWhover 100 years
30 m3.65 m/s4,953 kWhover 100 years
40 m4.07 m/s6,914 kWhover 100 years
50 m4.42 m/s8,865 kWh80 years

Counties around Deer Lodge County

4 of the 6 closest counties are windier at turbine height; the windiest, Jefferson County, averages 4.03 m/s.

Sun versus wind in Deer Lodge County

Deer Lodge County gets 4.01 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,171 kWh a year; one kW of the turbine above makes 495. Kilowatt for kilowatt, panels make 2.4 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.