TurbinePayback

Wind Turbine Payback in Jefferson County, MT

Wind turbine payback in Jefferson County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Jefferson County, MT averages 4.03 m/s (9 mph). A 10 kW turbine there would make about 6,729 kWh a year, worth $951 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of over 100 years, and the turbine is built to last about 20.

What to do in Jefferson County

A home turbine is not worth buying for savings in Jefferson County unless your spot is far windier than the county average, 8.2 m/s at the hub against 4.03 m/s here. Per kW, solar panels would make about 1,171 kWh a year here against the turbine's 673, so get a solar quote first.

What would have to change

Against the rest of MT

Jefferson County is the 2,037th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Jefferson County

January is the strongest month here, at 4.96 m/s and about 1,043 kWh. July is the weakest, 3.11 m/s and 250 kWh, so the best month makes 4.2 times the worst. November to March brings in 61% of the year's output in Jefferson County.

MonthWind at 30 mOutputWorth
January4.96 m/s1,043 kWh$147
February4.54 m/s737 kWh$104
March4.51 m/s798 kWh$113
April4.05 m/s561 kWh$79
May3.56 m/s389 kWh$55
June3.41 m/s329 kWh$46
July3.11 m/s250 kWh$35
August3.14 m/s257 kWh$36
September3.51 m/s359 kWh$51
October4.16 m/s630 kWh$89
November4.69 m/s865 kWh$122
December4.77 m/s936 kWh$132

What a taller tower would buy

Measured at 10 m the wind in Jefferson County averages 2.98 m/s; at 50 m it is 4.64 m/s. That gives a shear exponent of 0.275, typical of ordinary open country. Going from 20 m to 50 m takes output from 4,763 to 10,195 kWh a year, 114% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m3.61 m/s4,763 kWhover 100 years
30 m4.03 m/s6,739 kWhover 100 years
40 m4.36 m/s8,539 kWh83 years
50 m4.64 m/s10,195 kWh69 years

Counties around Jefferson County

3 of the 6 closest counties are windier at turbine height; the windiest, Madison County, averages 4.63 m/s.

Sun versus wind in Jefferson County

Jefferson County gets 4.01 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,171 kWh a year; one kW of the turbine above makes 673. Kilowatt for kilowatt, panels make 1.7 times as much here as the turbine. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.