Wind Turbine Payback in Fall River County, SD

Wind turbine payback in Fall River County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Fall River County, SD averages 6.21 m/s (13.9 mph). A 10 kW turbine there would make about 21,262 kWh a year, worth $3,100 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 32 years, and the turbine is built to last about 20.

What to do in Fall River County

A home turbine is not worth buying for savings in Fall River County unless your spot is far windier than the county average, 8.1 m/s at the hub against 6.21 m/s here. Per kW, solar panels would make about 1,282 kWh a year here against the turbine's 2,126, so get a solar quote first.

What would have to change

Against the rest of SD

Fall River County is the 576th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Fall River County

January is the strongest month here, at 7.18 m/s and about 2,408 kWh. July is the weakest, 5.19 m/s and 1,174 kWh, so the best month makes 2.1 times the worst. November to March brings in 50% of the year's output in Fall River County.

MonthWind at 30 mOutputWorth
January7.18 m/s2,408 kWh$351
February6.65 m/s1,880 kWh$274
March6.44 m/s1,954 kWh$285
April6.31 m/s1,809 kWh$264
May5.93 m/s1,628 kWh$237
June5.60 m/s1,377 kWh$201
July5.19 m/s1,174 kWh$171
August5.32 m/s1,254 kWh$183
September5.71 m/s1,446 kWh$211
October6.35 m/s1,892 kWh$276
November6.81 m/s2,111 kWh$308
December7.07 m/s2,339 kWh$341

What a taller tower would buy

Measured at 10 m the wind in Fall River County averages 4.85 m/s; at 50 m it is 6.97 m/s. That gives a shear exponent of 0.225, typical of ordinary open country. Going from 20 m to 50 m takes output from 17,283 to 26,828 kWh a year, 55% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.67 m/s17,283 kWh40 years
30 m6.21 m/s21,285 kWh32 years
40 m6.63 m/s24,353 kWh28 years
50 m6.97 m/s26,828 kWh26 years

Counties around Fall River County

3 of the 6 closest counties are windier at turbine height; the windiest, Dawes County, averages 6.59 m/s.

Sun versus wind in Fall River County

Fall River County gets 4.39 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,282 kWh a year; one kW of the turbine above makes 2,126. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.7 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.