TurbinePayback

Wind Turbine Payback in Oglala Lakota County, SD

Wind turbine payback in Oglala Lakota County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Oglala Lakota County, SD averages 5.99 m/s (13.4 mph). A 10 kW turbine there would make about 19,630 kWh a year, worth $2,862 at SD's 14.58¢/kWh. Against an installed cost of about $100,000, that is a payback of 35 years, and the turbine is built to last about 20.

What to do in Oglala Lakota County

A home turbine is not worth buying for savings in Oglala Lakota County unless your spot is far windier than the county average, 8.1 m/s at the hub against 5.99 m/s here. Per kW, solar panels would make about 1,279 kWh a year here against the turbine's 1,963, so get a solar quote first.

What would have to change

Against the rest of SD

Oglala Lakota County is the 858th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in SD is Todd County at 6.77 m/s, payback 27 years.

Month by month in Oglala Lakota County

April is the strongest month here, at 6.38 m/s and about 1,849 kWh. July is the weakest, 5.46 m/s and 1,337 kWh, so the best month makes 1.4 times the worst. November to March brings in 44% of the year's output in Oglala Lakota County.

MonthWind at 30 mOutputWorth
January6.25 m/s1,832 kWh$267
February6.02 m/s1,523 kWh$222
March6.22 m/s1,809 kWh$264
April6.38 m/s1,849 kWh$270
May6.03 m/s1,692 kWh$247
June5.66 m/s1,416 kWh$206
July5.46 m/s1,337 kWh$195
August5.53 m/s1,381 kWh$201
September5.89 m/s1,550 kWh$226
October6.14 m/s1,765 kWh$257
November6.22 m/s1,756 kWh$256
December6.17 m/s1,781 kWh$260

What a taller tower would buy

Measured at 10 m the wind in Oglala Lakota County averages 4.67 m/s; at 50 m it is 6.73 m/s. That gives a shear exponent of 0.227, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,793 to 25,093 kWh a year, 59% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.47 m/s15,793 kWh43 years
30 m5.99 m/s19,653 kWh35 years
40 m6.4 m/s22,651 kWh30 years
50 m6.73 m/s25,093 kWh27 years

Counties around Oglala Lakota County

4 of the 6 closest counties are windier at turbine height; the windiest, Bennett County, averages 6.73 m/s.

Sun versus wind in Oglala Lakota County

Oglala Lakota County gets 4.38 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,279 kWh a year; one kW of the turbine above makes 1,963. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.5 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.