TurbinePayback

Wind Turbine Payback in Grant County, NE

Wind turbine payback in Grant County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Grant County, NE averages 6.73 m/s (15.1 mph). A 10 kW turbine there would make about 25,093 kWh a year, worth $3,242 at NE's 12.92¢/kWh. Against an installed cost of about $100,000, that is a payback of 31 years, and the turbine is built to last about 20.

What to do in Grant County

A home turbine is not worth buying for savings in Grant County unless your spot is far windier than the county average, 8.8 m/s at the hub against 6.73 m/s here. Per kW, solar panels would make about 1,340 kWh a year here against the turbine's 2,509, so get a solar quote first.

What would have to change

Against the rest of NE

Grant County is the 46th windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in NE is Cherry County at 6.83 m/s, payback 30 years.

Month by month in Grant County

January is the strongest month here, at 7.40 m/s and about 2,533 kWh. July is the weakest, 5.65 m/s and 1,456 kWh, so the best month makes 1.7 times the worst. November to March brings in 47% of the year's output in Grant County.

MonthWind at 30 mOutputWorth
January7.40 m/s2,533 kWh$327
February7.17 m/s2,168 kWh$280
March7.14 m/s2,384 kWh$308
April7.25 m/s2,370 kWh$306
May6.58 m/s2,037 kWh$263
June6.09 m/s1,676 kWh$217
July5.65 m/s1,456 kWh$188
August5.72 m/s1,501 kWh$194
September6.39 m/s1,857 kWh$240
October6.97 m/s2,281 kWh$295
November7.15 m/s2,313 kWh$299
December7.30 m/s2,475 kWh$320

What a taller tower would buy

Measured at 10 m the wind in Grant County averages 5.35 m/s; at 50 m it is 7.49 m/s. That gives a shear exponent of 0.209, typical of ordinary open country. Going from 20 m to 50 m takes output from 21,073 to 30,468 kWh a year, 45% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m6.18 m/s21,073 kWh37 years
30 m6.73 m/s25,104 kWh31 years
40 m7.15 m/s28,100 kWh28 years
50 m7.49 m/s30,468 kWh25 years

Counties around Grant County

1 of the 6 closest counties is windier at turbine height; the windiest, Hooker County, averages 6.82 m/s.

Sun versus wind in Grant County

Grant County gets 4.59 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,340 kWh a year; one kW of the turbine above makes 2,509. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.9 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.