TurbinePayback

Wind Turbine Payback in Wheatland County, MT

Wind turbine payback in Wheatland County

No. The turbine wears out before it pays for itself.

At 30 m, the height a home turbine tower usually reaches, the wind in Wheatland County, MT averages 5.89 m/s (13.2 mph). A 10 kW turbine there would make about 18,890 kWh a year, worth $2,669 at MT's 14.13¢/kWh. Against an installed cost of about $100,000, that is a payback of 38 years, and the turbine is built to last about 20.

What to do in Wheatland County

A home turbine is not worth buying for savings in Wheatland County unless your spot is far windier than the county average, 8.2 m/s at the hub against 5.89 m/s here. Per kW, solar panels would make about 1,183 kWh a year here against the turbine's 1,889, so get a solar quote first.

What would have to change

Against the rest of MT

Wheatland County is the 1,001st windiest of 3,144 US counties at turbine height; the national middle is 4.79 m/s. The windiest in MT is Fallon County at 6.64 m/s, payback 29 years.

Month by month in Wheatland County

January is the strongest month here, at 7.68 m/s and about 2,696 kWh. July is the weakest, 4.38 m/s and 732 kWh, so the best month makes 3.7 times the worst. November to March brings in 59% of the year's output in Wheatland County.

MonthWind at 30 mOutputWorth
January7.68 m/s2,696 kWh$381
February6.64 m/s1,875 kWh$265
March6.30 m/s1,865 kWh$264
April5.65 m/s1,405 kWh$199
May5.10 m/s1,125 kWh$159
June4.88 m/s966 kWh$136
July4.38 m/s732 kWh$103
August4.46 m/s771 kWh$109
September5.08 m/s1,074 kWh$152
October6.23 m/s1,820 kWh$257
November7.12 m/s2,293 kWh$324
December7.28 m/s2,465 kWh$348

What a taller tower would buy

Measured at 10 m the wind in Wheatland County averages 4.56 m/s; at 50 m it is 6.64 m/s. That gives a shear exponent of 0.233, typical of ordinary open country. Going from 20 m to 50 m takes output from 15,059 to 24,436 kWh a year, 62% more, before counting the extra cost of the taller tower. Why tower height decides it explains the shear behind these numbers.

Hub heightAverage windOutputPayback
20 m5.36 m/s15,059 kWh47 years
30 m5.89 m/s18,926 kWh37 years
40 m6.3 m/s21,955 kWh32 years
50 m6.64 m/s24,436 kWh29 years

Counties around Wheatland County

4 of the 6 closest counties are windier at turbine height; the windiest, Fergus County, averages 6.18 m/s.

Sun versus wind in Wheatland County

Wheatland County gets 4.05 kWh of sunshine per square metre a day on average. One kW of solar panels here would make roughly 1,183 kWh a year; one kW of the turbine above makes 1,889. This is one of the rare places where a kilowatt of turbine out-produces a kilowatt of panels, by 1.6 times. Panel output assumes an 80% system performance ratio. Wind or solar runs the same comparison for every county.

How this is worked out

Wind is NASA's Power climate record, the 2001-2025 average at 10 m and 50 m for the county's centre, carried to 30 m with this county's own measured wind shear and spread into hours with a Rayleigh distribution. The turbine is a generic 10 kW, 7 m rotor machine with 10% losses. Cost is $10,000 per kW installed with no tax credit, because the federal one ended in 2025. One county-centre number cannot see your hilltop or your tree line, so treat it as the starting point for a site survey, not a substitute. The full method and its weak spots are in how the numbers are made.